Environmental approval grantedBuildings & townships · Bangalore, Karnataka

Proposed Construction of 1BHK Residential Flats

Proposed Construction of 1BHK Residential Flats is an approved building project in Thammarasanahalli, Yelahanka, Bengaluru, Karnataka. The site covers 7.7 acres. Its stated project cost is ₹68 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 3 Mar 2023).

See it on the live map All projects in Bangalore

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since3 Mar 2023
Application filed3 Mar 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantM/S. Rajivgandhi Housing Corporation LTD.,
Land area7.7 acres (3.1 ha)
Project cost₹68 crore
Village / localityThammarasanahalli
Taluk / tehsilYelahanka
DistrictBangalore (Bengaluru)
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-00582

What the filings say

What is planned

M/s. Rajiv Gandhi Housing Corporation Ltd. proposes to construct a residential apartment project specifically for 1BHK flats. The development is planned on a site area of 32,374.9 square metres, of which 1,777.45 square metres is identified as encroached area, leaving 30,597.45 square metres (7.56 acres) available for development.

The project consists of 704 residential units distributed across 45 building blocks. Each block is designed with a configuration of a ground floor plus three upper floors (G+3UF). The buildings will reach a maximum height of 12.45 metres. The total built-up area is 28,246.44 square metres.

Project Figures

ItemDetail
Total Units704 (all 1BHK)
Number of Blocks45
Building Height12.45 m
ConfigurationG+3 Floors
Total Built-up Area28,246.44 sqm
Ground Coverage7,114.41 sqm (23.25%)
Landscape Area5,615.77 sqm (17.35%)
Driveway/Paved Area16,242.27 sqm (54.38%)
Parking Provided126 cars

Layout and design

The site layout includes internal roads with a width of 7.5 metres. The design achieves a Floor Area Ratio (FAR) of 0.85 against a permissible limit of 5.0. The achieved ground coverage is 23.25%, significantly lower than the permissible 65%. A dedicated Civic Amenities (CA) area of 1,625 square metres (5.02%) is also planned within the site.

Water, power and access

Water Supply: The total water requirement during the operational phase is estimated at 380 kilolitres per day (KLD). Of this, 230 KLD will be fresh water sourced from the Grampanchyath or BWSSB, and 150 KLD will be recycled water used for flushing. During construction, 50 KLD of treated water will be used.

Power: The total power requirement is 1,674 kW, to be sourced from Bangalore Electricity Supply Company (BESCOM). For backup, one diesel generator set of 125 kVA (or 250 kVA as per alternate project slides) will be installed with acoustic enclosures. The project also proposes using solar energy, aiming for 12% energy savings through LED lighting and efficient motors.

Access: The site is located near National Highway 4 (NH-4) and Hesaraghatta Road. Traffic management plans include bell-mouth shaped gates for smooth entry and exit. A traffic study indicates the current Level of Service (LOS) on nearby roads is 'C' (Good).

Environmental safeguards

Waste Management: A sewage treatment plant (STP) with a capacity of 345 KLD using Sequential Batch Reactor (SBR) technology is planned. Treated water will be reused for flushing and gardening, with an excess of 92 KLD to be used for floor washing or provided to nearby construction projects. For solid waste, an organic waste converter will handle 760 kg/day of wet waste to produce compost, while 507 kg/day of inorganic waste will be sent to authorized recyclers.

Rainwater Harvesting: The plan includes two rooftop rainwater collection sumps with a total capacity of 140 cubic metres (70 m3 each) and 16 recharge pits around the site periphery. An existing 'Kunte' (pond) on the site will also be utilized for storm water collection.

Greenery: The applicant plans to plant approximately 380 trees. This includes fruit-bearing trees like Jackfruit and Mango, medicinal trees such as Neem and Ashoka, and shade trees like Gulmohur and Jacaranda.

Timeline

The applicant's conceptual plan estimates a construction period of approximately three years from the start of the project.

Construction of 1BHK Residential Flats site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Construction of 1BHK Residential Flats: Site layout plan: 45 residential blocks, internal roads, and parking areas (preview)🔒 Sign in free to see it
Site layout plan: 45 residential blocks, internal roads, and parking areas
Construction of 1BHK Residential Flats: Landscape plan showing tree plantation and green belt areas (preview)🔒 Sign in free to see it
Landscape plan showing tree plantation and green belt areas
Construction of 1BHK Residential Flats: Water balance chart for operational phase (preview)🔒 Sign in free to see it
Water balance chart for operational phase
Construction of 1BHK Residential Flats: Contour map of the project site (preview)🔒 Sign in free to see it
Contour map of the project site

In context

1,390 applications in Bengaluru since January 2022 are in the same category (Buildings & townships): 1,004 approved, 205 filed or under review, and 178 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.7 acres, this one is larger than 56% of them.

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Thammarasanahalli, Yelahanka, Bengaluru, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from M/S. Rajivgandhi Housing Corporation LTD., in Bangalore

5 Rajivgandhi Housing Corporation LTD projects in Bangalore
All 7 Rajivgandhi Housing Corporation LTD projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.