Quick answers
What is this project?
SAC Admin Block and Sports Complex by Mangalore Jesuit Educational Society is a lapsed building project in Suratkal, Mangaluru, Dakshina Kannada, Karnataka. The site covers 7.6 acres.
Who is building it?
The applicant is Mangalore Jesuit Educational Society.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Suratkal, Mangaluru, Dakshina Kannada, Karnataka.
How big is it?
It has a stated cost of ₹76 crore and a site of 7.6 acres.
When was it filed?
The application was filed on 14 Mar 2024.
Project details
| Official title | Proposed Construction of SAC Admin Block and Sports Complex by Mangalore Jesuit Educational Society |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2024 |
| Application filed | 14 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mangalore Jesuit Educational Society |
| Land area | 7.6 acres (3.1 ha) |
| Project cost | ₹76 crore |
| Village / locality | Suratkal |
| Taluk / tehsil | Mangaluru |
| District | Dakshina Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-00648 |
What the filings say
What is planned
The Mangalore Jesuit Educational Society proposes the construction of a new SAC Admin Block and Sports Complex in Suratkal, Mangaluru. According to the applicant's project report, the development will consist of two primary blocks on a site area of 30,915.93 square metres (7.64 acres).
- Block 1 (Admin Block): Comprising two basements, a ground floor, seven upper floors, and a terrace floor.
- Block 2 (Auditorium, Sports, and Cafeteria Block): Comprising three basements, a ground floor, four upper floors, and a terrace floor.
The project includes a 300-metre track with a football ground situated above two levels of basement parking. The total built-up area is planned at 41,934.97 square metres. The facility is designed to accommodate approximately 1,226 persons, including staff and students across various classrooms, laboratories, and administrative offices.
Layout and design
The project follows a courtyard design intended to provide natural ventilation and daylight to interior spaces. The design incorporates self-shading features, including a ramp and curved vertical fins to reduce solar radiation on the facade. Glazing specifications include double-glazed, low heat gain glass with high visible light transmittance to balance energy efficiency with natural lighting.
Parking is planned for 344 Equivalent Car Spaces (ECS). Internal roads will cover 15,790.78 square metres (3.90 acres), representing 51.30% of the site area.
Land and surroundings
The project site is located at Survey Numbers 213, 176/1A1, 174/1A, and 175/1P2 in Kodialbail village. The Gurupura River is the nearest major water body, located approximately 1.79 km west of the site. The landscape area is planned to cover 10,157.81 square metres (2.51 acres), or 33% of the total plot. The applicant intends to plant 78 trees of native species, including Bilwa, Raamphal, Seetaaphal, and Kadamba, along with 41 ornamental plants.
Water, power and access
Water: During the operational phase, the total water requirement is estimated at 55.2 kilolitres per day (KLD), sourced from the Gram Panchayath or Mangalore City Corporation. Fresh water demand is 30.6 KLD, while 24.5 KLD will be met through recycled water for flushing. A Sewage Treatment Plant (STP) with a capacity of 55 KLD using Sequential Batch Reactor (SBR) technology is proposed to treat 52.4 KLD of generated sewage.
Power: The total power requirement is 1,500 kVA, to be supplied by the Bangalore Electricity Supply Company (BESCOM). One diesel generator set of 650 kVA is planned for backup power, located in the basement. Energy-saving measures include LED lighting, occupancy sensors, and Variable Frequency Drives (VFD) for lifts.
Access: The site is fronted by a 12-metre wide road connecting Light House to Jyothi Circle. It is located 1.04 km from the Mangalore Railway Station and 8.87 km from the Mangaluru International Airport.
Environmental safeguards
For rainwater harvesting, the applicant proposes a collection tank with a capacity of 176 cubic metres for rooftop runoff and 449 cubic metres for road and paved area runoff. Nineteen recharge pits are planned.
Solid waste management involves segregating waste at the source. Biodegradable waste (estimated at 122.6 kg/day) will be processed in an organic waste converter, while non-biodegradable waste (183.9 kg/day) will be handed over to authorized recyclers. Excavated earth, totaling 34,221.39 cubic metres, is intended to be reused entirely within the site for backfilling and landscaping.
| Item | Detail |
|---|---|
| Total Site Area | 3.09 hectares (7.64 acres) |
| Total Built-up Area | 41,934.97 sq. m. |
| Ground Coverage | 4,832.65 sq. m. (15.7%) |
| Green Belt Area | 10,157.81 sq. m. (33%) |
| STP Capacity | 55 KLD |
| Total Water Demand | 55.2 KLD |
| Power Requirement | 1,500 kVA |
| Excavated Earth | 34,221.39 cu. m. |
| Estimated Project Cost | ₹76 crore |
Mangalore Jesuit Educational SAC Admin Block and Sports Complex site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
236 applications in Dakshina Kannada since January 2022 are in the same category (Buildings & townships): 110 approved, 39 filed or under review, and 85 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.6 acres, this one is larger than 84% of them.
109 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Suratkal, Mangaluru, Dakshina Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "THE ALEXANDRIA" – Residential Development Project — environmental approval granted, 350 m away
- "Manhattan" Residential Apartment Project — environmental approval granted, 550 m away
- Additional Construction Activities — initial checks, 850 m away
- Expansion of Construction Activities — withdrawn, 850 m away
- Mixed Use Development Project by M/s. Northern Sky Properties Pvt. Ltd., — environmental approval granted, 1.1 km away
- Proposed Redevelopment of 'Central Market' – Market, Commercial cum MLCP… — environmental approval granted, 1.1 km away
- Expansion of "Municipal Market Complex with MLCP" — environmental approval granted, 1.3 km away
- Proposed Vertical Expansion of Commercial, MLCP and Residential Building -… — environmental approval granted, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.