Project details
| Official title | Construction of Residential Apartment |
|---|---|
| Status | Environmental approval granted |
| Status since | 16 Nov 2023 |
| Application filed | 16 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Shilpa High Rise Private Limited |
| Land area | 1.6 acres (0.7 ha) |
| Project cost | ₹20 crore |
| Village / locality | Vijanapura |
| Taluk / tehsil | Bengaluru East |
| District | Bangalore (Bengaluru) |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-00772 |
What the filings say
What is planned
Shilpa Highrise Pvt. Ltd. is proposing the construction of a residential apartment complex on 0.66 hectares (1.63 acres) of land in Vijinapura, Bengaluru East. The project report describes a single building with a configuration of a basement, ground floor, and eight upper floors (BF+GF+8UF), reaching a height of 29.99 metres. The development will provide 110 residential units with a total built-up area of 22,955.05 square metres.
According to the applicant's conceptual plan, the project is estimated to cost 20 crore and is expected to be completed within 24 months. The design achieves a ground coverage of 49.73% (3,257.23 square metres) and a Floor Area Ratio (FAR) of 2.24.
Layout and design
The site layout includes a 12.20-metre wide approach road. The applicant has planned for 423 car parking spaces, exceeding the required 121 spaces. Open spaces and driveways will occupy 1,131.40 square metres (17.27% of the site), while 2,161.57 square metres (33%) is dedicated to landscape and greenbelt development. The project includes a 6.00-metre wide fire driveway surrounding the building.
Land and surroundings
The project site is located at Survey No. 6 (old Sy no. 6/2) in Vijinapura Village, Mahadevapura Hobli. The land is designated for residential (mixed) use under the Bangalore Revised Master Plan 2015. The site has a level difference of 2 metres, with a gradient sloping towards the south-east.
Environmental settings noted in the documents include:
- NH 44: 369.2 metres west
- NH 75: 899.0 metres south-east
- K.R. Puram Railway Station: 909.8 metres south-east
- Beninganahalli Lake: 743.5 metres south
- Vijinapura Lake: 990 metres north-east
- Bannerghatta National Park: 24.5 kilometres south-west
Water, power and access
The total water requirement is estimated at 75 kilolitres per day (KLD). Fresh water (50 KLD) will be sourced from the Bangalore Water Supply and Sewerage Board (BWSSB), while 25 KLD will be met through recycled water for flushing. Wastewater generation is estimated at 64 KLD, to be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 70 KLD using Sequential Batch Reactor (SBR) technology.
Power demand is estimated at 500 kVA, to be supplied by Bangalore Electricity Supply Company (BESCOM). Two diesel generator sets of 250 kVA each are proposed for emergency backup.
Environmental safeguards
The applicant proposes several mitigation measures:
- Solid Waste: Total generation is estimated at 248 kg/day. Organic waste (99 kg/day) will be processed in an on-site organic waste converter, while inorganic waste (149 kg/day) will be handed to authorized recyclers.
- Rainwater Harvesting: A roof collection sump of 400 cubic metres and seven percolation pits are planned to recharge groundwater.
- Energy: Solar water heaters (70 units) will be installed on the terrace, with an overall energy saving target of 17%.
- Greenbelt: The plan includes planting 150 trees of native species such as Neem, Mango, and Honge.
- Corporate Environmental Responsibility (CER): The applicant has committed 20 lakhs over five years for improvements at the Government Model Primary School in Vijinapura, including RO units, toilet facilities, and building renovation.
| Item | Detail |
|---|---|
| Total Built-up Area | 22,955.05 square metres |
| Building Height | 29.99 metres |
| Total Units | 110 |
| STP Capacity | 70 KLD |
| Landscape Area | 2,161.57 square metres (33%) |
| Solid Waste Generation | 248 kg/day |
| Rainwater Sump Capacity | 400 cubic metres |
| Estimated Project Cost | 20 crore |
Shilpa High Rise Construction of Residential Apartment site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,390 applications in Bengaluru since January 2022 are in the same category (Buildings & townships): 1,004 approved, 205 filed or under review, and 178 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.6 acres, this one is smaller than 95% of them.
45 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vijanapura, Bengaluru East, Bengaluru, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Residential Apartment Building by M/s. V Group — lapsed, 950 m away
- Diversion of 2.8551 Ha of Forest land in Sy No. 59 of Jarakabande Kaval… — more information requested, 2.2 km away
- Proposed Non-Residential (IT/BT Activities) Office Building project by M/s.… — environmental approval granted, 2.8 km away
- Proposed Non-Residential (IT/BT Activities) Office Building by M/s. Bagmane… — cleared for impact study, 2.8 km away
- Proposed Sakra world Hospital Building by Takshasila Hospitals Operating… — environmental approval granted, 3 km away
- Development of "Residential Apartment with Club House" Project. by Arvind… — environmental approval granted, 3.1 km away
- Building project by M/s. SLV ESTATES — environmental approval granted, 3.1 km away
- M/s. Carnelia Realestate Holding Private Limited proposed "Non-Residential… — lapsed, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.