Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Apr 2023 |
| Application filed | 11 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Nagesh |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹76 lakh |
| Village / locality | Ramdurg |
| Taluk / tehsil | Gangawati |
| District | Koppal |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-01022 |
In context
188 applications in Koppal since January 2022 are in the same category (Mining): 135 approved, 21 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.5 acres, this one is smaller than 86% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 7.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.
Where it is
Ramdurg, Gangawati, Koppal, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone Quarry (Block-04) of Sri Siddarameshwar Bhovi Vaddara… — environmental approval granted, 100 m away
- Building Stone Quarry "Sri. Krishna" — environmental approval granted, 150 m away
- Building Stone Quarry "Sri. Krishna" — lapsed, 150 m away
- BUILDING STONE QUARRY (BLOCK-07) OF M/s. MALIYAMMA DEVI KALLU ODEYUVAVARA SANGHA — environmental approval granted, 600 m away
- Building Stone quarry with Manual Mining by M/s Jai Bheem Mahila Kallu… — lapsed, 700 m away
- Building Stone Quarry (Block-10) — environmental approval granted, 1.1 km away
- Building stone quarry of M/s Maruteshwara Kallu Odeyuvavara sangha — environmental approval granted, 1.2 km away
- Diversion of Forest Land for the Construction of Approach Road to the… — lapsed, 5.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.