Quick answers
What is Proposed Housing Scheme by Karnataka Housing Board?
Proposed Housing Scheme by Karnataka Housing Board is a proposed building project in Elechakanahalli, Mandya, Karnataka. The site covers 199.6 acres.
Who is building it?
The applicant is Maleyur Somashekar.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 2 Feb 2023), as of 27 Nov 2026.
Where is it?
In Elechakanahalli, Mandya, Karnataka.
How big is it?
It has a stated cost of ₹180 crore and a site of 199.6 acres.
When was it filed?
The application was filed on 2 Feb 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 2 Feb 2023 |
| Application filed | 2 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Maleyur Somashekar |
| Land area | 199.6 acres (80.8 ha) |
| Project cost | ₹180 crore |
| Village / locality | Elechakanahalli |
| Taluk / tehsil | Mandya |
| District | Mandya |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-01040 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 Sept 2023 | Environmental approval granted | 199.6 acres | ₹180 crore |
| Early planning filed 2 Feb 2023 (this page) | Cleared for impact study | 199.6 acres | ₹180 crore |
What the filings say
What is planned
The Karnataka Housing Board (KHB) proposes to develop a housing scheme on a total land area of 80.78 hectares (199.63 acres). The project is designed as a residential layout consisting of 2,398 sites of various categories to accommodate different income groups. The applicant's project report states the development will include residential plots, commercial areas, civic amenities, and significant open spaces.
Site Categories and Distribution
The layout is planned to include 2,398 plots categorized as follows:
- MIG (Middle Income Group): 935 plots (39% of total), typically 9x15 metres.
- LIG (Low Income Group): 705 plots (29% of total), typically 9x12 metres.
- HIG-I (High Income Group I): 405 plots (17% of total), typically 12x18 metres.
- EWS (Economically Weaker Section): 257 plots (11% of total), typically 6x9 metres.
- HIG-II (High Income Group II): 96 plots (4% of total), typically 15x24 metres.
Land Use Break-up
| Item | Area (Sq.m) | Percentage |
|---|---|---|
| Residential | 3,71,758 | 47.4% |
| Parks & Open Spaces | 2,60,123 | 33.2% |
| Roads | 87,965 | 11.2% |
| Civic Amenities | 41,407 | 5.3% |
| Commercial | 22,605 | 2.9% |
| Total Net Area | 7,83,858 | 100% |
Note: The total land includes 14,366.14 sq.m of Kharab-B land and 9,626.418 sq.m for the National Highway (NH-275) buffer.
Layout and design
The project is situated on the outskirts of Mandya, adjacent to the Bengaluru-Mysore Expressway (NH-275). The design emphasizes a sustainable and eco-friendly layout with over 33% of the area dedicated to parks and open spaces, exceeding the minimum requirement of 10% set by the Mandya Planning Authority. Internal roads will be asphalted, and a green belt will be developed along the periphery of the roads and the project boundary.
Land and surroundings
The site is located at Yelachakanahalli village in Mandya Taluk. The surrounding area within a 10 km radius is dominated by cropland (57.59%) and agricultural plantations (10.65%). Baseline studies conducted between December 2022 and February 2023 found no eco-sensitive zones, protected areas, or national parks within a 2 km radius. The topography is characterized by granitic gneisses. Approximately 1,410 trees are identified for removal prior to the construction phase.
Water, power and access
Water: During the construction phase, 32 KLD (Kilo Litres per Day) will be required, sourced from existing borewells. For the operational phase, the total water requirement is estimated at 1,670 KLD, to be sourced from the Rural Drinking Water and Sanitation Division, Mandya. Sewage will be treated in multiple Sewage Treatment Plants (STPs) with a combined capacity of 1,330 KLD. Treated water will be reused for gardening.
Power: The construction phase requires 24 kW, sourced from the Thubinakere Industrial Area. The operational phase requirement is 20,167.66 kW, provided by Chamundeshwari Electricity Supply Corporation Limited (CESCOM) through 134 transformers of 100 KVA each. Backup power will be provided by five diesel generator (DG) sets ranging from 24 KVA to 60 KVA.
Access: The site is directly accessible via NH-275. Internal roads will be developed to manage a projected increase in traffic.
Environmental safeguards
The applicant proposes several mitigation measures:
- Air Quality: Regular water sprinkling for dust suppression and stack heights of 10m for DG sets.
- Waste Management: Organic waste (estimated at 5.96 metric tonnes per day) will be treated in an Organic Waste Converter (OWC) to be used as manure. Inorganic waste will be handed over to authorized recyclers.
- Rainwater Harvesting: Proposals include safeguards for groundwater quality and maximizing the use of rainwater.
- Green Belt: A green belt covering 2,60,123 sq.m (64.16 acres) will be developed to act as a pollution sink and noise barrier.
Timeline
The applicant estimates a project implementation period of 24 months. The construction phase is expected to employ approximately 160 labourers, while the operational phase will require 20 staff for maintenance and security.
Karnataka Housing Board Housing Scheme site plan and layout
3 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
11 applications in Mandya since January 2022 are in the same category (Buildings & townships): 5 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected. At 199.6 acres, this one is larger than 55% of them.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Elechakanahalli, Mandya, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Housing Scheme by Karnataka Housing Board — environmental approval granted, 0 m away
- Building Stone Quarry (QL No. 993) "M/s. D.K. Associates Pro. Sri. K. Dasharath" — lapsed, 2 km away
- Building Stone Quarry (QL No. 1003) "Smt. K.R. Prabhavathi Jayaram" — lapsed, 2.2 km away
- Building Stone Quarry(QL No. 919) "Smt. K. R. Prabhavathi Jayaram" — lapsed, 2.3 km away
- Building Stone Quarry (QL No. 1002) "Smt. K.R. Prabhavathi Jayaram" — lapsed, 2.4 km away
- Environmental Clearance for Building Stone Quarry in 3-17 Acres of Patta Land… — environmental approval granted, 2.5 km away
- Building Stone Quarry (QL No. 1004) "Smt. K.R. Prabhavathi Jayaram" — lapsed, 2.5 km away
- Building Stone & M-Sand Quarry — environmental approval granted, 2.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.