LapsedIndustry · Chitradurga, Karnataka

Expansion of Steel Plant from its current capacity of 0.2 MTPA to 1.0 MTPA finished Steel products – Establishment of new Iron Ore Beneficiation unit (16,10,000 TPA), New Iron ore Pellet Plant (14,00,000 TPA) New Coal Gasifier (30,000 Nm3/hr.), Expansion of sponge iron production through DRI Kilns from 90,000 TPA to 11,17,800 TPA, Expansion of Hot Billets / Slabs / production by installing 2 x 40T Induction Furnaces (Hot Metal: 3,31,200TPA) to enhance billet production from 1,29,600 TPA to 4,80,

Expansion of Steel Plant from its current capacity of 0.2 MTPA to 1.0 MTPA finished Steel products – Establishment of new Iron Ore Beneficiation unit (16,10,000 TPA), New Iron ore Pellet Plant (14,00,000 TPA) New Coal Gasifier (30,000 Nm3/hr.), Expansion of sponge iron production through DRI Kilns from 90,000 TPA to 11,17,800 TPA, Expansion of Hot Billets / Slabs / production by installing 2 x 40T Induction Furnaces (Hot Metal: 3,31,200TPA) to enhance billet production from 1,29,600 TPA to 4,80 is a lapsed industrial project in Heggere, Challakere, Chitradurga, Karnataka. The site covers 501.2 acres. Its stated project cost is ₹1,727 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Oct 2024).

See it on the live map All projects in Chitradurga

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusLapsed
Status since29 Oct 2024
Application filed22 Oct 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantPrakash Sponge Iron and Power Private Limited
Land area501.2 acres (202.8 ha)
Project cost₹1,727 crore
Village / localityHeggere
Taluk / tehsilChallakere
DistrictChitradurga
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-01089

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 28 Feb 2024Environmental approval granted501.2 acres₹1,727 crore
Early planning filed 22 Oct 2023 (this page)Lapsed501.2 acres₹1,727 crore

In context

11 applications in Chitradurga since January 2022 are in the same category (Industry): 10 approved, 0 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 501.2 acres, this one is larger than 64% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Heggere, Challakere, Chitradurga, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Prakash Sponge Iron and Power Private Limited in Chitradurga

3 Prakash Sponge Iron projects in Chitradurga
All 5 Prakash Sponge Iron projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.