Project details
| Official title | Construction of Housing Project at Sy. No. 19,20 of Konadasapura Village (Phase-3) in Bidarahalli Hobli, Bangalore East Taluk |
|---|---|
| Status | Environmental approval granted |
| Status since | 24 Jun 2023 |
| Application filed | 24 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Bangalore Development Authority |
| Land area | 10 acres (4.1 ha) |
| Project cost | ₹374.8 crore |
| Village / locality | Goravikere |
| Taluk / tehsil | Bengaluru East |
| District | Bangalore (Bengaluru) |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-01095 |
What the filings say
What is planned
The Bangalore Development Authority (BDA) proposes to construct Phase 3 of a housing project in Konadasapura Village. The project is planned on a total land area of 4.05 hectares (10 acres), divided into a residential and recreation zone of 3.39 hectares (8.39 acres) and a commercial zone of 0.65 hectares (1.61 acres).
The residential component consists of three towers with a maximum height of 43.5 metres (Ground plus 13 floors). A total of 592 units are planned, categorized as follows:
- 2 BHK: 396 units
- 3 BHK: 112 units
- 3.5 BHK: 24 units
- Economically Weaker Section (EWS) 1 BHK: 60 units
The project also includes a recreation centre and a commercial building (Ground plus 4 floors) which will house theatres with a seating capacity of 300. The total built-up area is 1,01,646.73 square metres, comprising 85,629.36 square metres for residential use and 16,017.37 square metres for commercial use.
Layout and design
The residential towers occupy a ground coverage of 7,118.60 square metres (22.08%), while the commercial building covers 2,471.28 square metres (37.81%). The applicant has allocated 4,094.21 square metres (10.56%) for landscaping.
Parking is planned for a total of 1,008 Equivalent Car Units (ECU). This includes 850 spaces for the residential and recreation area (distributed across two basements and surface parking) and 158 spaces for the commercial block (basement and surface).
Land and surroundings
The site is located at Survey Numbers 19 and 20 in Konadasapura Village, Bidarahalli Hobli. It is situated approximately 150 metres from National Highway 648 (Dabbaspet to Hosur) and 1 km from National Highway 75. The nearest railway station is Whitefield, located 5 km to the south.
Several water bodies are in the vicinity, including Konadasapura Lake (0.6 km north), Kattanallur Lake (0.65 km northeast), and Hoskote Lake (2.0 km northeast). The project site falls within Seismic Zone II.
Water, power and access
The total water requirement for the operational phase is estimated at 717 kilolitres per day (KLD). Fresh water demand of 315 KLD will be sourced from the Bangalore Water Supply and Sewerage Board (BWSSB), while 402 KLD will be met through recycled treated water.
Waste water generation is expected to be 423 KLD. The applicant proposes to install two Sewage Treatment Plants (STP) using Sequential Batch Reactor (SBR) technology, with capacities of 400 KLD and 50 KLD. For rainwater management, 15 recharge structures with a capacity of 24.74 cubic metres each are planned.
Power will be supplied by the Bangalore Electricity Supply Company (BESCOM) with a connected load of 2.4 MW. Backup power will be provided by five Diesel Generator (DG) sets with a combined capacity of 770 kVA.
Environmental safeguards
Solid waste generation is estimated at 1,866 kg per day. This includes 885 kg of biodegradable waste, which will be treated on-site using a smart composter with a 900 kg/day capacity. The remaining 981 kg of non-biodegradable waste will be disposed of through authorized vendors.
The applicant plans to plant 417 trees (335 in the residential area and 82 in the commercial area). Proposed species include Neem, Shisham, Ashok, and Amaltas. For fire safety, the project includes wet risers, automatic sprinklers, and an underground water tank of 3,00,000 litres.
| Item | Detail |
|---|---|
| Total Units | 592 |
| Residential Built-up Area | 85,629.36 m2 |
| Commercial Built-up Area | 16,017.37 m2 |
| Max Building Height | 43.5 m |
| Total Water Demand | 717 KLD |
| STP Capacity | 450 KLD |
| Connected Power Load | 2.4 MW |
| Solid Waste Generation | 1,866 kg/day |
| Total Parking | 1,008 ECU |
Housing Project site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,390 applications in Bengaluru since January 2022 are in the same category (Buildings & townships): 1,004 approved, 205 filed or under review, and 178 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 10 acres, this one is larger than 66% of them.
114 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Goravikere, Bengaluru East, Bengaluru, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- My Home Mixed Use Township — initial checks, 200 m away
- My Home Mixed Use Township — under environmental review, 200 m away
- Bangalore Development Authority (BDA) — environmental approval granted, 400 m away
- Residential Apartment Project by Bangalore Development Authority BDA — withdrawn, 550 m away
- Residential Apartment Project by Bangalore Development Authority BDA — environmental approval granted, 550 m away
- Vishal Vincent Tony, Representing M/s. ARATT ALCHEMY ESSENCE LLP -… — environmental approval granted, 650 m away
- Brigade Integrated Mixed Use Development — environmental approval granted, 650 m away
- Brigade Integrated Mixed Use Development — cleared for impact study, 650 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.