LapsedIndustry · Koppal, Karnataka

Expansion of existing 10 MW Thermal Power Plant to 0.2MTPA Integrated Steel Plant with 1,65,000 TPA Sponge Iron, 45,000 TPA Charge Chrome, 2,13,840 TPA Billets. 2,03,150 TPA TMT Rods with 25 MW Captive Power Plant by M/s Shantha Steel & Power Pvt. Ltd

Expansion of existing 10 MW Thermal Power Plant to 0.2MTPA Integrated Steel Plant with 1,65,000 TPA Sponge Iron, 45,000 TPA Charge Chrome, 2,13,840 TPA Billets. 2,03,150 TPA TMT Rods with 25 MW Captive Power Plant by M/s Shantha Steel & Power Pvt. Ltd is a lapsed industrial project in Kenchandoni, Koppal, Karnataka. The site covers 50 acres. Its stated project cost is ₹326.9 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Oct 2024).

See it on the live map All projects in Koppal

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of existing 10 MW Thermal Power Plant to 0.2MTPA Integrated Steel Plant with…

Project details

Official titleExpansion of existing 10 MW Thermal Power Plant to 0.2MTPA Integrated Steel Plant with 1,65,000 TPA Sponge Iron, 45,000 TPA Charge Chrome, 2,13,840 TPA Billets. 2,03,150 TPA TMT Rods with 25 MW Captive Power Plant by M/s Shantha Steel & Power Pvt. Ltd at Koppal District Karnataka
StatusLapsed
Status since29 Oct 2024
Application filed24 Apr 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantShantha Steel & Power PVT LTD
Land area50 acres (20.2 ha)
Project cost₹326.9 crore
Village / localityKenchandoni
Taluk / tehsilKoppal
DistrictKoppal
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-01181

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 16 Sept 2026Lapsed50 acres₹326.9 crore
Early planning filed 24 Apr 2023 (this page)Lapsed50 acres₹326.9 crore

In context

48 applications in Koppal since January 2022 are in the same category (Industry): 28 approved, 16 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 50 acres, this one is smaller than 60% of them.

13 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kenchandoni, Koppal, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.