What is Developing? Open the mapMap

Cleared for impact studyIndustry · Koppal, Karnataka

Amalgamation of Environmental Clearances, Expansion and Modification of the Existing Sponge Iron Plant Into 'integrated Steel Plant' With Increase in Project Area, Increase in Production Capacity of the Sponge Iron Plant (One Kiln With Preheater Technology) and by Adding Mineral Beneficiation Plant, Pelletization Plant, Induction Furnace, Submerged Arc Furnace, Billet Caster, Rolling Mill, Pipe Mill, Galvanizing Plant, Oxygen Plant, Cement Grinding Unit and Captive Power Plant (Whrb and Afbc)

Amalgamation of Environmental Clearances, Expansion and Modification of the Existing Sponge Iron Plant Into 'integrated Steel Plant' With Increase in Project Area, Increase in Production Capacity of the Sponge Iron Plant (One Kiln With Preheater Technology) and by Adding Mineral Beneficiation Plant, Pelletization Plant, Induction Furnace, Submerged Arc Furnace, Billet Caster, Rolling Mill, Pipe Mill, Galvanizing Plant, Oxygen Plant, Cement Grinding Unit and Captive Power Plant (Whrb and Afbc) is a proposed industrial project in Hire Bagnalu, Koppal, Karnataka. The site covers 153.8 acres. Its stated project cost is ₹1,028 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 20 Feb 2024).

See it on the live map All projects in Koppal

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Amalgamation of Environmental Clearances, Expansion and Modification of the Existing…

Project details

StatusCleared for impact study
Status since20 Feb 2024
Application filed20 Dec 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantVanya Steels Private Limited
Land area153.8 acres (62.2 ha)
Project cost₹1,028 crore
Village / localityHire Bagnalu
Taluk / tehsilKoppal
DistrictKoppal
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-01252

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 25 Mar 2025Environmental approval granted153.8 acres₹1,028 crore
Early planning filed 20 Dec 2023 (this page)Cleared for impact study153.8 acres₹1,028 crore

In context

48 applications in Koppal since January 2022 are in the same category (Industry): 28 approved, 16 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 153.8 acres, this one is larger than 75% of them.

32 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Hire Bagnalu, Koppal, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Vanya Steels Private Limited in Koppal

All 5 Vanya Steels projects across India

About this information