What is Developing? Open the mapMap

Cleared for impact studyIndustry · Ballari, Karnataka

"Cold Rolled Grain Oriented" (CRGO) Steel Plant - 216000 TPA by JSW- JFE Electrical Steel Private Limited at KIADB Industrial area- Phase-II, Kuduthini Village

"Cold Rolled Grain Oriented" (CRGO) Steel Plant - 216000 TPA by JSW- JFE Electrical Steel Private Limited at KIADB Industrial area- Phase-II, Kuduthini Village is a proposed industrial project in Kudatini, Ballari, Karnataka. The site covers 428.5 acres. Its stated project cost is ₹11,890 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 30 Jan 2025).

See it on the live map All projects in Ballari

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: "Cold Rolled Grain Oriented" (CRGO) Steel Plant - 216000 TPA by JSW- JFE Electrical…

Project details

Official titleProposed installation of "Cold Rolled Grain Oriented" (CRGO) Steel Plant - 216000 TPA by JSW- JFE Electrical Steel Private Limited at KIADB Industrial area- Phase-II, Kuduthini Village in Ballari District of Karnataka State
StatusCleared for impact study
Status since30 Jan 2025
Application filed20 Dec 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantJSW- JFE Electrical Steel Private Limited
Land area428.5 acres (173.4 ha)
Project cost₹11,890 crore
Village / localityKudatini
Taluk / tehsilBallari
DistrictBallari
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-01487

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 14 Nov 2025Environmental approval granted199.9 acres₹11,890 crore
Early planning filed 20 Dec 2024 (this page)Cleared for impact study428.5 acres₹11,890 crore

In context

80 applications in Ballari since January 2022 are in the same category (Industry): 45 approved, 15 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 428.5 acres, this one is larger than 71% of them.

32 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kudatini, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.