Cleared for impact studyIndustry · Bagalkote, Karnataka

Proposed Expansion of Integrated Cement Plant – Clinker Capacity 0.6 Mmtpa and Cement Production Capacity From 0.054 Mmtpa to 1.0 Mmtpa (Phase-I: 0.2 Mmtpa, Phase-Ii: 0.3 Mmtpa, Phase-Iii: 0.5 Mmtpa)- (Ppc/Opc/Psc/Pcc)

Proposed Expansion of Integrated Cement Plant – Clinker Capacity 0.6 Mmtpa and Cement Production Capacity From 0.054 Mmtpa to 1.0 Mmtpa (Phase-I: 0.2 Mmtpa, Phase-Ii: 0.3 Mmtpa, Phase-Iii: 0.5 Mmtpa)- (Ppc/Opc/Psc/Pcc) is a proposed industrial project in Kaladgi, Bagalkot, Bagalkote, Karnataka. The site covers 14.8 acres. Its stated project cost is ₹453 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 20 Oct 2024).

See it on the live map All projects in Bagalkote

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion of Integrated Cement Plant – Clinker Capacity 0.6 Mmtpa and Cement Production Capacity From 0.054 Mmtpa to 1.0 Mmtpa (Phase-I: 0.2 Mmtpa, Phase-Ii: 0.3 Mmtpa, Phase-Iii: 0.5 Mmtpa)- (Ppc/Opc/Psc/Pcc) is a proposed industrial project in Kaladgi, Bagalkot, Bagalkote, Karnataka. The site covers 14.8 acres.

Who is building it?

The applicant is Shri Keshav Cements and Infra Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 20 Oct 2024), as of 27 Nov 2026.

Where is it?

In Kaladgi, Bagalkot, Bagalkote, Karnataka.

How big is it?

It has a stated cost of ₹453 crore and a site of 14.8 acres.

When was it filed?

The application was filed on 8 Oct 2024.

Project details

StatusCleared for impact study
Status since20 Oct 2024
Application filed8 Oct 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantShri Keshav Cements and Infra Limited
Land area14.8 acres (6 ha)
Project cost₹453 crore
Village / localityKaladgi
Taluk / tehsilBagalkot
DistrictBagalkote
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-01566

In context

61 applications in Bagalkote since January 2022 are in the same category (Industry): 39 approved, 11 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 14.8 acres, this one is smaller than 98% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kaladgi, Bagalkot, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.