What is Developing? Open the mapMap

Cleared for impact studyIndustry · Raichur, Karnataka

Expansion of Integrated Steel Plant with capacity of Sponge Iron (DRI) from 1,28,000 TPA TO 6,08,000 TPA, Steel Melting Shop from 2,00,000 TPA TO 4,16,000 TPA, Rolling Mill from 2,00,000 TPA to 4,00,000 TPA, Captive Power Plant from 30 MW to 70 MW (WHRB 8 MW to 48 MW & AFBC 22 MW) and establishment of Pelletization Plant of 3,60,000 TPA, Sinter Plant of 6,00,000 TPA, Blast Furnace of 340 Cum by M/s. TEXCON STEELS LTD.

Expansion of Integrated Steel Plant with capacity of Sponge Iron (DRI) from 1,28,000 TPA TO 6,08,000 TPA, Steel Melting Shop from 2,00,000 TPA TO 4,16,000 TPA, Rolling Mill from 2,00,000 TPA to 4,00,000 TPA, Captive Power Plant from 30 MW to 70 MW (WHRB 8 MW to 48 MW & AFBC 22 MW) and establishment of Pelletization Plant of 3,60,000 TPA, Sinter Plant of 6,00,000 TPA, Blast Furnace of 340 Cum by M/s. TEXCON STEELS LTD is a proposed industrial project in Wadloor, Raichur, Karnataka. The site covers 164.5 acres. Its stated project cost is ₹1,144 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 13 Jun 2024).

See it on the live map All projects in Raichur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Integrated Steel Plant with capacity of Sponge Iron (DRI) from 1,28,000 TPA TO 6,08,000 TPA, Steel Melting Shop from 2,00,000 TPA TO 4,16,000 TPA, Rolling Mill from 2,00,000 TPA to 4,00,000 TPA, Captive Power Plant from 30 MW to 70 MW (WHRB 8 MW to 48 MW & AFBC 22 MW) and establishment of Pelletization Plant of 3,60,000 TPA, Sinter Plant of 6,00,000 TPA, Blast Furnace of 340 Cum by M/s. TEXCON STEELS LTD is a proposed industrial project in Wadloor, Raichur, Karnataka. The site covers 164.5 acres.

Who is building it?

The applicant is Texcon Steels Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 13 Jun 2024), as of 27 Nov 2026.

Where is it?

In Wadloor, Raichur, Karnataka.

How big is it?

It has a stated cost of ₹1,144 crore and a site of 164.5 acres.

When was it filed?

The application was filed on 6 Jun 2024.

Project details

StatusCleared for impact study
Status since13 Jun 2024
Application filed6 Jun 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantTexcon Steels Limited
Land area164.5 acres (66.6 ha)
Project cost₹1,144 crore
Village / localityWadloor
Taluk / tehsilRaichur
DistrictRaichur
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-01672

In context

11 applications in Raichur since January 2022 are in the same category (Industry): 9 approved, 0 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 164.5 acres, this one is larger than 73% of them.

15 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Wadloor, Raichur, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Texcon Steels Limited in Raichur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.