Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 1 Jan 2025 |
| Application filed | 20 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Bala Ramudu Ravoor |
| Land area | 6.1 acres (2.5 ha) |
| Project cost | ₹1.4 crore |
| Village / locality | Appalapuram |
| Taluk / tehsil | Sandur |
| District | Ballari |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-01787 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Apr 2024 (this page) | Environmental approval granted | 6.1 acres | ₹1.4 crore |
| New project filed 17 Apr 2024 | Withdrawn | 6.1 acres | ₹1.4 crore |
In context
213 applications in Ballari since January 2022 are in the same category (Mining): 78 approved, 56 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 6.1 acres, this one is smaller than 84% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Appalapuram, Sandur, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "White Quartz, Building Stone & Murram" of Shri. R. Balaramudu — withdrawn, 0 m away
- Transfer of Environmental Clearances, from 'M/s A-One Steels India Pvt. Ltd.'… — environmental approval granted, 4.3 km away
- Expansion in Environmental Clearance of the existing Ferro Alloys and Coke… — under environmental review, 4.3 km away
- Mining project by M/s. GVPR ENGINEERS LIMITED — withdrawn, 4.4 km away
- Mining project by M/s. GVPR ENGINEERS LIMITED — environmental approval granted, 4.4 km away
- Mining project by M/s. GVPR ENGINEERS LIMITED — withdrawn, 4.4 km away
- Haraginadona Iron Ore Mine — environmental approval granted, 4.5 km away
- Amendment in Environment Clearance for Proposed Technology Change by Replacing… — returned to applicant, 5.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.