Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 29 May 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Laxminarayan Vinayak Hegde |
| Land area | 267.5 acres (108.3 ha) |
| Project cost | ₹191 crore |
| Village / locality | Dharwad |
| Taluk / tehsil | Dharwad |
| District | Dharwad |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-01849 |
What the filings say
What is planned
The Karnataka Housing Board (KHB) proposes to develop a Sites and Service Scheme in Sattur village, Dharwad. The project is designed as a residential township involving the layout of various categories of plots and supporting infrastructure. The applicant's project report states that the total investment for the project is ₹191 crore, which includes construction, land, and other developmental costs. The anticipated construction period is approximately 12 months.
The scheme is planned on a total extent of 108.25 hectares (267.50 acres). According to the conceptual plan, the net area for land use analysis is 78.33 hectares (193.58 acres), after excluding reserved areas and kharab land.
The layout includes 2,500 residential plots of various sizes:
- EWS (6.0m x 9.0m): 402 plots
- LIG (9.0m x 12.0m): 683 plots
- MIG (9.0m x 15.0m): 790 plots
- HIG-I (12.0m x 18.0m): 515 plots
- HIG-II (15.0m x 24.0m): 110 plots
Layout and design
The land use analysis for the 78.33-hectare net area is distributed as follows:
| Item | Area (Sqm) | Percentage |
|---|---|---|
| Residential | 3,87,062.52 | 49.41% |
| Commercial | 29,374.67 | 3.75% |
| Civic Amenities | 39,235.20 | 5.01% |
| Park & Open Space | 1,88,689.52 | 24.09% |
| Roads | 1,38,008.30 | 17.74% |
| Total | 7,83,370.23 | 100.00% |
The plan also designates 9,793.21 square metres for group housing and includes specific areas for a 2 MLD (million litres per day) Sewage Treatment Plant (STP), an overhead water tank, and a rainwater harvesting storage area.
Land and surroundings
The project site is located at Sattur Village in Dharwad Taluk. The site coordinates are 15°23'43.97"N latitude and 75°2'11.15"E longitude. The surrounding area includes several educational and commercial landmarks, such as the SDM Medical College, SDM Dental College, and the Indian Institute of Information Technology (IIIT) Dharwad. A railway line and the Hubli-Dharwad Highway (NH-73) are located in the vicinity. The Hubli-Dharwad road is approximately 5.3 km from the layout, while the Dharwad Railway Station is 8.3 km away.
Water, power and access
Water for the proposed project will be sourced from the Karnataka Urban Infrastructure Development & Finance Corporation (KUIDFC). Power supply is expected to be provided by the Hubli Electricity Supply Company Limited (HESCOM).
The layout is designed with a hierarchy of roads, including 30m, 24m, 18m, 15m, 12m, and 9m wide Master Plan roads to ensure internal connectivity and access to the highway. Stormwater management includes planned drains ranging from 2m to 3m in width.
Environmental safeguards
The applicant has identified several monitoring locations for baseline environmental studies conducted between March 2024 and May 2024. This includes six ambient air quality stations, eight noise level sampling points, and thirteen water quality sampling locations (eight for groundwater and five for surface water from nearby lakes like Ittigatti and Sattur lakes).
Planned environmental infrastructure includes a 2 MLD STP and a dedicated rainwater harvesting storage area. The layout achieves 24.09% of its area as parks and open spaces, exceeding the minimum requirement of 10%.
Karnataka Housing Board Sites and Service Scheme site plan and layout
2 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
28 applications in Dharwad since January 2022 are in the same category (Buildings & townships): 13 approved, 5 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 267.5 acres, this one is larger than 81% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dharwad, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- A Diversion of 0.3237 Ha of forest land by NHAI — lapsed, 1.5 km away
- A Diversion of 0.3237 Ha of forest land by NHAI — lapsed, 1.5 km away
- Building project by M/s. Hubballi Durable Goods Cluster Private Limited — initial checks, 2.2 km away
- Building project by M/s. Hubballi Durable Goods Cluster Private Limited — withdrawn, 2.2 km away
- Building project by M/s. Hubballi Durable Goods Cluster Private Limited — withdrawn, 2.2 km away
- SDM COLLEGE OF MEDICAL SCIENCES AND HOSPITAL by M/s. Shri Dharmasthala… — environmental approval granted, 2.7 km away
- SDM COLLEGE OF MEDICAL SCIENCES AND HOSPITAL by M/s. Shri Dharmasthala… — cleared for impact study, 2.7 km away
- Sdm College of Medical Sciences and Hospital — initial checks, 2.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.