Quick answers
What is Mineral Beneficiation plant by M/s Doddanavar Brothers?
Mineral Beneficiation plant by M/s Doddanavar Brothers is a proposed mining project in Ramthal, Hungund, Bagalkote, Karnataka. The site covers 9.8 acres.
Who is building it?
The applicant is Doddanavar Brothers.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 21 Nov 2024), as of 27 Nov 2026.
Where is it?
In Ramthal, Hungund, Bagalkote, Karnataka.
How big is it?
It has a stated cost of ₹24 crore and a site of 9.8 acres.
When was it filed?
The application was filed on 8 Aug 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 21 Nov 2024 |
| Application filed | 8 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Doddanavar Brothers |
| Land area | 9.8 acres (4 ha) |
| Project cost | ₹24 crore |
| Village / locality | Ramthal |
| Taluk / tehsil | Hungund |
| District | Bagalkote |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-01996 |
In context
150 applications in Bagalkote since January 2022 are in the same category (Mining): 99 approved, 11 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 9.8 acres, this one is larger than 73% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Ramthal, Hungund, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest land measuring 12.97 Ha for Mining Activity and 0.97 Ha… — more information requested, 1 km away
- Diversion of 7.5 Mtrs Safety Zone Around the Outside Periphery of the Existing… — lapsed, 2 km away
- Iron Ore Mining (ML No. 2642) M/s. Arihant Minerals — environmental approval granted, 2.1 km away
- "Ordinary Sand Mining" of Sri. Ramesh Shivanand Yadawad — environmental approval granted, 5.5 km away
- Construct an Alternative Road From Kamatagi Town to Shubodaya Pre-Primary &… — lapsed, 5.6 km away
- Construction/ improvement of the road which is connecting Hanuman Temple to… — lapsed, 5.9 km away
- Ordinary Sand Quarry" of Sri. Sindhurlaxman P Rathod — lapsed, 8 km away
- Widening to Two Lane With Paved Shoulder From Km 103.225(Pattadakal) to Km… — more information requested, 8.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.