One of 3 filings for this project. The project's main page, with every filing and where each stands: Application for Split of EC obtained vide File No. J-11011/500/2017-IA-II(I), dated 7th…
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 29 Nov 2024 |
| Application filed | 30 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Other |
| Sector | Industry |
| Applicant | Epsilon Graphite Private Limited |
| Land area | 98.6 acres (39.9 ha) |
| Project cost | ₹200 crore |
| Village / locality | Musenayakanahalli |
| Taluk / tehsil | Sandur |
| District | Ballari |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-02241 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Other filed 21 Jan 2025 | Environmental approval granted | 98.6 acres | ₹200 crore |
| Other filed 11 Dec 2024 | Returned to applicant | 98.6 acres | ₹200 crore |
| Other filed 30 Sept 2024 (this page) | Returned to applicant | 98.6 acres | ₹200 crore |
In context
80 applications in Ballari since January 2022 are in the same category (Industry): 45 approved, 15 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 98.6 acres, this one is smaller than 59% of them.
31 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Musenayakanahalli, Sandur, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for Split of EC obtained vide File No. J-11011/500/2017-IA-II(I),… — environmental approval granted, 0 m away
- Application for Split of EC obtained vide File No. J-11011/500/2017-IA-II(I),… — returned to applicant, 0 m away
- Proposed Graphite Manufacturing Plant by M/s. Epsilon Graphite Private Limited — returned to applicant, 0 m away
- Request for name change in Environment Clearance from JSW Paints Private… — environmental approval granted, 850 m away
- Proposed Expansion of Slag Grinding & Mixing Unit from 6.0 MTPA to 12.0 MTPA… — environmental approval granted, 1.3 km away
- Proposed Expansion of Slag Grinding & Mixing Unit from 6.0 MTPA to 12.0 MTPA… — cleared for impact study, 1.3 km away
- Industrial project by JSW Electrical Steel Private Limited — withdrawn, 2.3 km away
- Expansion of M/s. Minera Steel and Power Private Limited from 0.15 MTPA to… — lapsed, 2.5 km away
All 4 Epsilon Graphite projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.