Project details
| Official title | Proposal for Amendment in Ec Condition Granted Vide Ltr (J-11015 /28 / 2018-Ia-Ii (M)) Dtd 13.08.2021 of Devadari Iron Ore Mine With Capacity of 2.0 Mtpa Iron Ore (Rom) and 500 Tpa Manganese Ore Production Along With 2.0 Mtpa Wet Beneficiation Plant of M/S. Kiocl Limited for Permission As Interim Arrangement for Transportation of Iron Ore by Road Till Installation of Downhill Conveyor System / Over a Period of Five (05) Years, Whichever Is Earlier, in 401.5761 Ha. |
|---|---|
| Status | Environmental approval granted |
| Status since | 9 Dec 2024 |
| Application filed | 8 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Kiocl Limited |
| Land area | 992.3 acres (401.6 ha) |
| Project cost | ₹787.5 crore |
| Village / locality | Doni Malai |
| Taluk / tehsil | Sandur |
| District | Ballari |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-02295 |
In context
213 applications in Ballari since January 2022 are in the same category (Mining): 78 approved, 56 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 992.3 acres, this one is larger than 93% of them.
7 other mining leases have applied within 500 m of this site; together with this one they cover 9,145.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 25 mining leases have applied within 5 km.
Where it is
Doni Malai, Sandur, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Devadari Iron Ore Mine with a capacity of 2.0 MTPA Iron Ore (ROM) and 500 TPA… — under environmental review, 0 m away
- Diversion of 4.864 ha of forest land in Swamimalai Block Forest (South),… — lapsed, 0 m away
- Transfer of FC (Stage II FC vide F.No.4-KRB 1483/2022-BAN/321, 19-09-2024 )… — lapsed, 50 m away
- Land-Use Change of M/S Kfil Part Lease Area for the Approach Road to Devadari… — lapsed, 50 m away
- Re-Diversion proposal for approach road over an extent of 3.862ha already… — lapsed, 50 m away
- Re-Diversion proposal for an extent of 4.11 ha of FC area of KFIL in Devadari… — lapsed, 50 m away
- Re-diversion of 1.389 Ha of Forest Land for approach road in favor of… — under forest review, 50 m away
- Diversion proposal for an extent of 0.67 ha of forest land in Devadari Range,… — lapsed, 50 m away
More from Kiocl Limited in Ballari
- Devadari Iron Ore Mine with a capacity of 2.0 MTPA Iron Ore (ROM) and 500 TPA… — under environmental review
- Transfer of FC (Stage II FC vide F.No.4-KRB 1483/2022-BAN/321, 19-09-2024 )… — lapsed
- Prospecting for Iron and Manganese Ore in Block-05 over an extent of 43.48 ha… — forest land use approved
- Land-Use Change of M/S Kfil Part Lease Area for the Approach Road to Devadari… — lapsed
- Re-Diversion proposal for approach road over an extent of 3.862ha already… — lapsed
- Re-Diversion proposal for an extent of 4.11 ha of FC area of KFIL in Devadari… — lapsed
11 Kiocl projects in Ballari
All 16 Kiocl projects across India