"Expansion of Grain Based Ethanol Plant from 40 KLPD to 100 KLPD and Cogeneration Power Plant from 0.9 MWh to 2.8 MWh"

"Expansion of Grain Based Ethanol Plant from 40 KLPD to 100 KLPD and Cogeneration Power Plant from 0.9 MWh to 2.8 MWh" is a withdrawn industrial project in Kuratagi, Karatagi, Koppal, Karnataka. The site covers 11.1 acres. Its stated project cost is ₹155.7 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 20 Dec 2025).

See it on the live map All projects in Koppal

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusWithdrawn
Status since20 Dec 2025
Application filed20 Dec 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantTungabhadra Ethanol Private Limited
Land area11.1 acres (4.5 ha)
Project cost₹155.7 crore
Village / localityKuratagi
Taluk / tehsilKaratagi
DistrictKoppal
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-02982

In context

48 applications in Koppal since January 2022 are in the same category (Industry): 28 approved, 16 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11.1 acres, this one is smaller than 98% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kuratagi, Karatagi, Koppal, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Tungabhadra Ethanol Private Limited in Koppal

All 4 Tungabhadra Ethanol projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.