One of 2 filings for this project. The project's main page, with every filing and where each stands: Industrial project by M/s. Saivijay Pragati Steels Udyog Pvt Ltd.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Mar 2026 |
| Application filed | 16 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Saivijay Pragati Steel Udyog Private Limited |
| Land area | 31.7 acres (12.8 ha) |
| Project cost | ₹95 crore |
| Village / locality | Haravanahalli |
| Taluk / tehsil | Hosapete |
| District | Vijayanagar |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-03208 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 16 Jul 2025 (this page) | Lapsed | 31.7 acres | ₹95 crore |
| New project filed 28 Apr 2023 | Environmental approval granted | 31.7 acres | ₹95 crore |
In context
22 applications in Vijayanagar since January 2022 are in the same category (Industry): 12 approved, 5 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 31.7 acres, this one is smaller than 64% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Haravanahalli, Hosapete, Vijayanagar, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Sponge Iron Manufacturing Plant from 195 TPD to 500 TPD (Existing… — cleared for impact study, 0 m away
- Expansion of Sponge Iron Plant Production Capacity from 195 TPD to 395 TPD by… — returned to applicant, 0 m away
- Industrial project by M/s. Saivijay Pragati Steel Udyog Private Limited. — lapsed, 0 m away
- Industrial project by M/s. Saivijay Pragati Steels Udyog Pvt Ltd. — environmental approval granted, 150 m away
- Industrial project by M/s. Rosvar Iron And Power Pvt Ltd — environmental approval granted, 900 m away
- Environmental Clearance for proposed 95 TPD DRI plant (Sponge Iron), 5 MW WHRB… — cleared for impact study, 3.3 km away
- "Ordinary Sand Mining" of Sri. Siraj Ahmad P Bijapur — environmental approval granted, 5 km away
- Building Stone (M-Sand) Quarry — environmental approval granted, 6.9 km away
More from Saivijay Pragati Steel Udyog Private Limited in Vijayanagar
- Expansion of Sponge Iron Manufacturing Plant from 195 TPD to 500 TPD (Existing… — cleared for impact study
- Expansion of Sponge Iron Plant Production Capacity from 195 TPD to 395 TPD by… — returned to applicant
- Industrial project by M/s. Saivijay Pragati Steel Udyog Private Limited. — lapsed
All 5 Saivijay Pragati Steel Udyog projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.