"Ordinary Sand Block-RSB -16" of Chief Engineer (Civil) RTPS is a lapsed mining project in Benakal, Devadurga, Raichur, Karnataka. The site covers 12.5 acres.
Who is building it?
The applicant is Chief Engineer (Civil) RTPS karnataka power corporation ltd, Raichur Thermal power station.
Has it been approved?
No. The application was lapsed on 31 May 2026, so it is no longer under consideration.
Where is it?
In Benakal, Devadurga, Raichur, Karnataka.
How big is it?
It has a stated cost of ₹1.1 crore and a site of 12.5 acres.
When was it filed?
The application was filed on 30 Dec 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Ordinary Sand Block-RSB -16" of Chief Engineer (Civil) RTPS
Project details
| Status | Lapsed |
|---|---|
| Status since | 31 May 2026 |
| Application filed | 30 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Chief Engineer (Civil) RTPS karnataka power corporation ltd, Raichur Thermal power station |
| Land area | 12.5 acres (5.1 ha) |
| Project cost | ₹1.1 crore |
| Village / locality | Benakal |
| Taluk / tehsil | Devadurga |
| District | Raichur |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-03213 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Dec 2025 (this page) | Lapsed | 12.5 acres | ₹1.1 crore |
| Early planning filed 13 May 2025 | Cleared for impact study | 12.5 acres | ₹1.1 crore |
In context
131 applications in Raichur since January 2022 are in the same category (Mining): 98 approved, 17 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.5 acres, this one is smaller than 52% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 25 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 13 mining leases have applied within 5 km.
Where it is
Benakal, Devadurga, Raichur, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand Block-RSB -16" of Chief Engineer (Civil) RTPS — cleared for impact study, 0 m away
- "RSB-25, Dhondabali Sand Mining Block -01" — under environmental review, 500 m away
- "RSB-25, Dhondabali Sand Mining Block -01" — cleared for impact study, 500 m away
- Ordinary Sand Block-RSB -26 — initial checks, 850 m away
- Ordinary Sand Block-RSB -26 — cleared for impact study, 850 m away
- "Ordinary Sand Block-RSB - 27" of Sri.Shivaputrappa B Sajjanar — initial checks, 1.2 km away
- "Ordinary Sand Block-RSB - 27" of Sri.Shivaputrappa B Sajjanar — cleared for impact study, 1.2 km away
- Ordinary Sand Block-RSB -17 — cleared for impact study, 1.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.