Quick answers
What is this project?
Transfer of Environmental Clearance from M/s. Shree Venus Health Science to M/s. Astal Laboratories Limited is an approved industrial project in Chiksugur, Raichur, Karnataka. The site covers 2 acres.
Who is building it?
The applicant is Astal Laboratories Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Mar 2026), as of 27 Nov 2026.
Where is it?
In Chiksugur, Raichur, Karnataka.
How big is it?
It has a stated cost of ₹3.2 crore and a site of 2 acres.
When was it filed?
The application was filed on 29 Dec 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Mar 2026 |
| Application filed | 29 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Astal Laboratories Limited |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹3.2 crore |
| Village / locality | Chiksugur |
| Taluk / tehsil | Raichur |
| District | Raichur |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-03361 |
In context
11 applications in Raichur since January 2022 are in the same category (Industry): 9 approved, 0 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2 acres, this one is smaller than 91% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chiksugur, Raichur, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bulk drugs manufacturing unit by M/s SRC Laboratories Pvt Ltd. — environmental approval granted, 100 m away
- Proposed Common Effluent Treatment Plant of 1.5 MLD (1 MLD inorganic + 0.5 MLD… — under environmental review, 400 m away
- Proposed Common Effluent Treatment Plant of 1.5 MLD (1 MLD inorganic + 0.5 MLD… — cleared for impact study, 400 m away
- Bulk Drug and Intermediate Manufacturing Unit by M/s. Activz Life Sciences (I)… — environmental approval granted, 600 m away
- Application for No Increase in Pollution Load — initial checks, 750 m away
- Application for No Increase in Pollution Load — initial checks, 750 m away
- Proposed for Manufacturing of Bulk Drugs & Intermediates Unit Total Capacity… — lapsed, 750 m away
- Application for No Increase in Pollution Load — initial checks, 750 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.