Quick answers
What is this project?
Standalone Proposed Grinding and Packing Unit for Cement Manufacturing is a proposed industrial project in Akrali, Khanapur, Belagavi, Karnataka. The site covers 2.4 acres.
Who is building it?
The applicant is Mustaq Shaik.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 28 Apr 2026), as of 27 Nov 2026.
Where is it?
In Akrali, Khanapur, Belagavi, Karnataka.
How big is it?
It has a stated cost of ₹1.9 crore and a site of 2.4 acres.
When was it filed?
The application was filed on 12 Sept 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 28 Apr 2026 |
| Application filed | 12 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Mustaq Shaik |
| Land area | 2.4 acres (1 ha) |
| Project cost | ₹1.9 crore |
| Village / locality | Akrali |
| Taluk / tehsil | Khanapur |
| District | Belagavi |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-03436 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 12 Sept 2025 (this page) | Cleared for impact study | 2.4 acres | ₹1.9 crore |
| New project filed 19 Jul 2024 | Withdrawn | 2.4 acres | ₹1.9 crore |
In context
63 applications in Belagavi since January 2022 are in the same category (Industry): 35 approved, 20 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.4 acres, this one is smaller than 100% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Akrali, Khanapur, Belagavi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Standalone Proposed Grinding and Packing Unit for Cement Manufacturing. — withdrawn, 0 m away
- Diversion of Forest Land in Watere and Mohisetha Villages of Khanapur Taluk,… — lapsed, 4.1 km away
- Diversion of forest land for the Upgradation and Development of road from… — initial checks, 4.1 km away
- Application for Transfer of Lease of 3.255 Ha of Diverted Forest Land in Londa… — lapsed, 4.1 km away
- Diversion of Forest Land in Londa, Watere and Mohisetha Villages of Khanapur… — lapsed, 4.3 km away
- Diversion of Forest Land for the Upgradation and Development of Road From… — initial checks, 7.2 km away
- Diversion of Forest Land for the Upgradation and Development of Road From… — initial checks, 8.5 km away
- Diversion of Forest Land for the Upgradation and Development of Road From Main… — initial checks, 10.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.