One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Group Housing by M/s. MSU Ventures LLP
Project details
| Status | Withdrawn |
|---|---|
| Status since | 11 Feb 2025 |
| Application filed | 11 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Msu Ventures LLP |
| Land area | 9.6 acres (3.9 ha) |
| Project cost | ₹88 crore |
| Village / locality | Godena Halli |
| Taluk / tehsil | Yelahanka |
| District | Bangalore (Bengaluru) |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-04244 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 11 Apr 2025 | Environmental approval granted | 9.6 acres | ₹88 crore |
| New project filed 11 Feb 2025 (this page) | Withdrawn | 9.6 acres | ₹88 crore |
What the filings say
What is planned
The applicant, MSU Ventures LLP, proposes to develop a group housing project on a site measuring 3.87 hectares (9.55 acres). The project involves the construction of 15 residential blocks, designated as Blocks A through P (excluding I).
The building configuration consists of:
- Blocks A, B, C, D, E, G, H, J, K, L, M, N, O, and P: Ground Floor + 2 Upper Floors.
- Block F: Cellar + Ground Floor + 2 Upper Floors.
The project will provide a total of 110 dwelling units. The total gross built-up area is 44,217.50 sq.m, with a net site area for development of 38,137.74 sq.m. The maximum height of the buildings is planned at 10.80 metres. The construction period is estimated to be approximately 36 months.
| Item | Detail |
|---|---|
| Total Site Area | 38,662.80 sq.m |
| Net Site Area | 38,137.74 sq.m |
| Total Gross Built-Up Area | 44,217.50 sq.m |
| Total Units | 110 |
| Total Blocks | 15 |
| Permissible FAR | 2.00 |
| Achieved FAR | 1.02 |
| Maximum Building Height | 10.80 m |
| Estimated Project Cost | 88 crore |
Layout and design
The site layout includes a network of internal roads, primarily 7.50 metres wide, with a 12.00-metre wide road providing access from Gadenahalli to Meenakunte. The ground coverage is 13,459.79 sq.m (35.29% of the net site area).
Parking is planned for 105 Equivalent Car Spaces (ECS). The design incorporates specific visitor parking areas (designated 1 through 5) and extensive two-wheeler parking zones distributed around the blocks. A 5-metre setback is maintained around the site boundary.
Land and surroundings
The project is located at Survey No. 59 in Gadenahalli Village, Yalahanka Taluk. The site is currently an agricultural area with existing trees. A nala (drain) is located approximately 60 metres north of the site. The nearest town is Meenakunte, 1.15 km to the southeast, and the Bettahalsoor Railway Station is 3.68 km to the southwest. The Bangalore International Airport is approximately 9.17 km to the east.
Water, power and access
Water: During the operation phase, the total water requirement is estimated at 76.73 kilolitres per day (KLD). The primary source will be the Gram Panchayat. Fresh water demand is calculated at 36.74 KLD, while 39.99 KLD will be met through recycled water for flushing and landscaping. A Sewage Treatment Plant (STP) with a capacity of 70 KLD using Sequential Batch Reactor (SBR) technology is proposed. During construction, water will be sourced from treated water suppliers.
Power: The total power demand is 500 kVA, to be supplied by the Bangalore Electricity Supply Company (BESCOM). One 500 kVA diesel generator set is proposed for backup power, located in the basement.
Access: The site is connected by the 12.00-metre wide Gadenahalli to Meenakunte Road.
Environmental safeguards
The applicant plans to develop a green belt and landscape area covering 9,534.44 sq.m (25% of the net site area). This includes planting 477 trees of native species such as Bilwa, Raamphal, Seetaaphal, and Bevu, along with 50 ornamental plants.
Rainwater harvesting will include a roof-top collection tank of 1,454 cubic metres and 57 recharge pits for surface runoff. Solid waste management involves an Organic Waste Converter (OWC) with a 5-ton capacity to treat an estimated 88 kg/day of biodegradable waste. Inorganic waste (132 kg/day) will be handed over to authorized recyclers. Solar energy measures include solar water heaters and photovoltaic modules, expected to save approximately 28.08% of the total energy consumption.
MSU Ventures Group Housing site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,390 applications in Bengaluru since January 2022 are in the same category (Buildings & townships): 1,004 approved, 205 filed or under review, and 178 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.6 acres, this one is larger than 64% of them.
54 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Godena Halli, Yelahanka, Bengaluru, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Group Housing by M/s. MSU Ventures LLP — environmental approval granted, 0 m away
- Residential Development Project by M/s. Embassy Developments Limited., — initial checks, 1.1 km away
- Residential Development Project by M/s. Embassy Developments Limited., — cleared for impact study, 1.1 km away
- Residential Development Project by M/s. Embassy Developments Limited., — cleared for impact study, 1.1 km away
- EC Transfer of Mixed Use Development " Embassy Springs" by M/s. Embassy… — environmental approval granted, 1.2 km away
- Expansion and Modification of "Embassy Springs" - Mixed Use Development by… — withdrawn, 1.2 km away
- Expansion and Modification of "Embassy Springs" - Mixed Use Development by… — cleared for impact study, 1.2 km away
- Expansion and Modification of "Embassy Springs" - Mixed Use Development by… — cleared for impact study, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.