One of 2 filings for this project. The project's main page, with every filing and where each stands: Environmental Clearance to Proposed Change in Product Mix with an Increase in Production…
Project details
| Status | Under environmental review |
|---|---|
| Status since | 9 Nov 2026 |
| Application filed | 8 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Satyadeeptha Pharmaceuticals LTD |
| Land area | 11.9 acres (4.8 ha) |
| Project cost | ₹150.7 crore |
| Village / locality | Humnabad (Rural) |
| Taluk / tehsil | Homnabad |
| District | Bidar |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-04342 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 8 Sept 2026 (this page) | Under environmental review | 11.9 acres | ₹150.7 crore |
| Early planning filed 6 Oct 2025 | Cleared for impact study | 11.9 acres | ₹150.7 crore |
In context
35 applications in Bidar since January 2022 are in the same category (Industry): 16 approved, 5 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11.9 acres, this one is larger than 80% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Humnabad (Rural), Homnabad, Bidar, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance to Proposed Change in Product Mix with an Increase in… — cleared for impact study, 0 m away
- Proposed for expansion of existing Bulk Drugs & Drug Intermediates… — cleared for impact study, 150 m away
- Proposed Change in Product mix with Increase in Production Capacity of Bulk… — withdrawn, 150 m away
- AMENDMENT TO ENVIRONMENTAL CLEARANCE CONDITION By M/s. Kalpasthana Life Care… — lapsed, 250 m away
- Industrial project by Purogene Labs Private Limited — environmental approval granted, 250 m away
- Submission of EC Amendment by Virupaksha Organics Limited, Unit-VI (Formerly… — lapsed, 350 m away
- Transfer of Environmental Clearance (EC) from Kshatriya Laboratories Pvt. Ltd.… — environmental approval granted, 350 m away
- Transfer of Environmental Clearance (EC) from M/s. Kshatriya Laboratories Pvt.… — withdrawn, 350 m away
More from Satyadeeptha Pharmaceuticals LTD in Bidar
All 3 Satyadeeptha Pharmaceuticals projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.