Project details
| Status | Under environmental review |
|---|---|
| Status since | 7 Nov 2026 |
| Application filed | 9 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Msr Royal Park |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹52 crore |
| Village / locality | Harohalli |
| Taluk / tehsil | Anekal |
| District | Bangalore (Bengaluru) |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-04369 |
What the filings say
What is planned
M/s. MSR Royal Park proposes to develop a residential building project on a site area of 7,992.51 square metres (1.97 acres) in Harohalli, Bangalore. The applicant's project report describes the construction of two residential towers, Tower A and Tower B, both comprising a basement, a ground floor, and 12 upper floors, reaching a maximum height of 39.95 metres.
The project is designed to accommodate 159 dwelling units. Tower A will contain 102 units, while Tower B will have 57 units. The total gross built-up area is planned at 26,411.54 square metres. Parking facilities are designed for 188 Equivalent Car Spaces (ECS), distributed across the basement (126 spaces), ground floor (45 spaces), and surface parking (17 spaces).
| Item | Detail |
|---|---|
| Total Site Area | 7,992.51 sq.m. |
| Net Site Area | 6,440.69 sq.m. |
| Total Gross Built-up Area | 26,411.54 sq.m. |
| Total Dwelling Units | 159 |
| Maximum Building Height | 39.95 m |
| Total Parking Provided | 188 ECS |
| Landscape Area | 1,610.17 sq.m. (25%) |
| Ground Coverage | 1,926.47 sq.m. (29.91%) |
Layout and design
The site layout includes 1,926.47 square metres of ground coverage and 2,904.05 square metres dedicated to roads and open areas. A 12-metre wide road provides access in front of the site, and the plan includes a 12-metre setback all around the buildings. The project achieves a Floor Area Ratio (FAR) of 2.249.
Energy conservation measures include the use of LED lighting in common areas, solar water heaters, and solar photovoltaic modules. The applicant plans to use 200 square metres of rooftop area for solar water heating and 150 square metres for solar panels, aiming for a total solar energy utilization of 55,000 kWh per year.
Land and surroundings
The project is located at Survey No. 71/2 in Harohalli Village, Anekal Taluk. The nearest town is Harohalli, approximately 0.93 km to the south. Connectivity is provided by the Mullur-Chandapura Road. The site is situated about 1.30 km east of Huskuru Lake. The Kempegowda International Airport is approximately 37.09 km to the north.
Excavation for the project is expected to generate 32,745.51 cubic metres of soil. The applicant plans to reuse this for backfilling footings (16,372.76 cubic metres), retaining walls (11,214.47 cubic metres), and internal road filling. Topsoil will be scooped to a depth of one foot and stockpiled for landscaping.
Water, power and access
The total water requirement during the operation phase is estimated at 110.90 kilolitres per day (KLD). Fresh water, sourced from borewells, will account for 28.33 KLD. The remaining demand will be met through recycled treated water for flushing (35.78 KLD), landscaping (3.22 KLD), and car washing (3.76 KLD).
Power for the project will be supplied by the Bangalore Electricity Supply Company (BESCOM) with a total requirement of 750 kVA. A single 750 kVA diesel generator set, located in the basement, will provide backup power.
Environmental safeguards
A Sewage Treatment Plant (STP) with a capacity of 100 KLD using Sequential Batch Reactor (SBR) technology is planned to treat approximately 94.27 KLD of generated wastewater. For solid waste, the project is expected to generate 318 kg per day, comprising 127.20 kg of organic waste and 190.80 kg of inorganic waste. Organic waste will be treated in an on-site organic waste converter with a capacity of 0.75 tons.
Rainwater harvesting measures include a 52 cubic metre collection tank for rooftop runoff and a 70 cubic metre tank for road and paved area runoff. Two recharge pits are also proposed. The green belt development plan specifies planting 80 trees of native species, including Bilwa, Bevu, and Honge, along the boundaries and in landscape areas.
MSR Royal Park Residential Building Plan site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,390 applications in Bengaluru since January 2022 are in the same category (Buildings & townships): 1,004 approved, 205 filed or under review, and 178 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2 acres, this one is smaller than 89% of them.
133 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Harohalli, Anekal, Bengaluru, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Residential Apartment With Amenity Project — lapsed, 1.2 km away
- Residential Villas by M/s Vaishnavi Infrastructure and Properties LLP — under environmental review, 1.3 km away
- Development of "Residential Apartment with Clubhouse" by S.R. Developers — environmental approval granted, 1.6 km away
- Residential Development with Club House by Infraedge Management Services… — environmental approval granted, 1.7 km away
- Proposed Residential Development by M/s. Ensemble Residential Projects — environmental approval granted, 1.8 km away
- Proposed Residential Development by M/s. Ensemble Residential Projects — cleared for impact study, 1.8 km away
- Proposed Residential Development Plan by M/s. Nambiar Ensemble Residential… — lapsed, 1.9 km away
- Proposed Residential Development Plan by M/s. Nambiar Ensemble Residential… — environmental approval granted, 1.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.