Quick answers
What is Fortune Tower?
Fortune Tower is an approved mixed-use project in Anagola, Belagavi, Karnataka. It plans 45 units of up to 7 floors on 1.2 acres.
Who is building it?
The applicant is The Fortune Five.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Mar 2026), as of 27 Nov 2026.
Where is it?
In Anagola, Belagavi, Karnataka.
How big is it?
It has a stated cost of ₹65 crore and a site of 1.2 acres.
When was it filed?
The application was filed on 30 Jan 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Mar 2026 |
| Application filed | 30 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | The Fortune Five |
| Use | Mixed use |
| Units | 45 |
| Floors (tallest) | 7 |
| Basements | 1 |
| Parking spaces | 180 |
| Land area | 1.2 acres (0.5 ha) |
| Built-up area | 22,936 m² (2,46,881 sq ft) |
| Plot area | 4,906 m² (52,808 sq ft) |
| Project cost | ₹65 crore |
| Village / locality | Anagola |
| Taluk / tehsil | Belagavi |
| District | Belagavi |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-04402 |
What the filings say
What is planned
Fortune Tower is a mixed-use development project by The Fortune Five, located on Khanapur Road in Belagavi. The applicant's project report states that the development is an expansion of an existing project. Construction was previously completed up to the fifth floor for a built-up area of 16,942 square metres. The current proposal expands the fifth floor and adds two additional floors, bringing the total built-up area to 22,935.69 square metres.
The project consists of a single block with a configuration of Basement + Ground + 7 Floors. It includes 45 residential apartment units and commercial spaces for retail and offices. The residential portion accounts for 10,153.69 square metres, while the commercial portion covers 12,782 square metres.
| Item | Detail |
|---|---|
| Total Plot Area | 0.49 hectares (1.21 acres) |
| Total Built-up Area | 22,935.69 sq m |
| Residential Units | 45 flats |
| Building Height | 26.90 m |
| Total Parking Spaces | 180 (including 45 for EV charging) |
| Estimated Project Cost | ₹65 crore |
Layout and design
The building is designed with a basement for parking, a ground floor for retail, and upper floors for a mix of retail, office, and residential use. The third floor is designated for both commercial office space and residential apartments, while the fourth through seventh floors are residential. The ground coverage area is 2,694.92 square metres (54.92% of the plot). Hard-paved areas, including roads and walkways, cover 1,524.46 square metres (31.06%).
Land and surroundings
The project site is located at CTS No. 6160/3, 4, 8 on Khanapur Road (National Highway 748) in Angol, Belagavi. The site is situated in a commercial zone near the Angol Industrial Area. Surrounding landmarks include the Belagavi Railway Station (3 km north) and Belagavi Airport (13 km northeast). Several lakes are located in the vicinity, including Angol Lake (1.34 km east) and Majagaon Lake (1.94 km southeast).
Water, power and access
Water for the project will be sourced from the Karnataka Urban Water Supply Drainage Board (KUWSDB). The total water requirement is estimated at 96 kilolitres per day (KLD), with 87 KLD of wastewater expected to be generated. A 95 KLD Sewage Treatment Plant (STP) is proposed to treat this wastewater for reuse in flushing (39 KLD), gardening (7 KLD), and air conditioning cooling tower makeup (41 KLD).
Power demand is estimated at 1,200 kVA, to be supplied by HESCOM. For backup, the applicant proposes three diesel generator (DG) sets with capacities of 125 kVA, 910 kVA, and 610 kVA. Access to the site is directly from the 36-metre wide Khanapur Road (NH 4A/748).
Environmental safeguards
The project includes an Environment Management Plan (EMP) to mitigate impacts. Solid waste generation is estimated at 615 kg per day, of which 246 kg will be organic waste treated in an on-site Organic Waste Converter (OWC). Inorganic waste (369 kg per day) will be sent to authorized recyclers.
Air pollution from DG sets will be managed using stacks of appropriate height and acoustic enclosures. For water conservation, the applicant proposes a rooftop rainwater harvesting system and recharge pits for surface runoff. The landscape plan includes 686.87 square metres of greenery on natural earth and 315 square metres on the podium.
Timeline
The applicant filed for environmental clearance in January 2026. Following the anticipated approval in March 2026 and subsequent Consent for Establishment (CTE) in May 2026, the project expansion is scheduled to initiate in June 2026. Completion is estimated by December 2027.
Fortune Tower site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
37 applications in Belagavi since January 2022 are in the same category (Buildings & townships): 9 approved, 21 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.2 acres, this one is smaller than 68% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Anagola, Belagavi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mixed-Use Development Project by Mr. Deepak Appasaheb Patil — environmental approval granted, 500 m away
- Proposed Residential Apartment by M/s. Ambica Infra Build — environmental approval granted, 1.6 km away
- 4/6 Lane Belagavi Ring Road (NH 848R) design Chainage from Km 46.253 to Km… — lapsed, 4.1 km away
- Ayurvedic Hospital & College by M/S. Dr. B. R. Ambedkar Education & Social… — more information requested, 4.4 km away
- The Formist Mixed Use Project — environmental approval granted, 7.8 km away
- Building Stone Quarry "M/s. Samruddhi Stone Crusher" — more information requested, 8.2 km away
- Laterite Quarry Project, — initial checks, 8.3 km away
- Homeopathic Hospital & Pharmacy College by M/s. KLE Academy of Higher… — environmental approval granted, 8.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.