Quick answers
What is this project?
Expansion of Building Stone Quarry (QL No. 961) "M/s. Keshava Constructions Aggregates" is a lapsed mining project in Seethi, Kolar, Karnataka. The site covers 6 acres.
Who is building it?
The applicant is Keshava Construction Aggregates.
Has it been approved?
No. The application was lapsed on 21 Aug 2026, so it is no longer under consideration.
Where is it?
In Seethi, Kolar, Karnataka.
How big is it?
It has a stated cost of ₹1.3 crore and a site of 6 acres.
When was it filed?
The application was filed on 29 Jun 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 21 Aug 2026 |
| Application filed | 29 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Keshava Construction Aggregates |
| Land area | 6 acres (2.4 ha) |
| Project cost | ₹1.3 crore |
| Village / locality | Seethi |
| Taluk / tehsil | Kolar |
| District | Kolar |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-04436 |
In context
149 applications in Kolar since January 2022 are in the same category (Mining): 109 approved, 20 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6 acres, this one is larger than 81% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Seethi, Kolar, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial Building by M/S Purplestar Hygiene Private Limited — lapsed, 4.8 km away
- Grey Granite quarry, Quarry No. 859, lease area of 6 Acres 10 Guntas, located… — environmental approval granted, 5.6 km away
- Commercial (Factory) Building project — environmental approval granted, 5.7 km away
- Proposed to Develop the Vemagal 2nd Phase Industrial Area, Harjenahalli,… — environmental approval granted, 6.1 km away
- Proposed to Develop the Vemagal 2nd Phase Industrial Area, Harjenahalli,… — cleared for impact study, 6.1 km away
- Integrated Solid Waste Management Processing and Disposal Facility,… — cleared for impact study, 8.9 km away
- Waste management project by M/s. Meera Envirotech Private Limited — environmental approval granted, 9.1 km away
- Building project by M/s. Meera Envirotech Private Limited — cleared for impact study, 9.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.