Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Nov 2026 |
| Application filed | 15 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | BASAVANA GOWDA g |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Devarabuddena Halli |
| Taluk / tehsil | Sandur |
| District | Ballari |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-04478 |
In context
213 applications in Ballari since January 2022 are in the same category (Mining): 78 approved, 56 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4 acres, this one is smaller than 92% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Devarabuddena Halli, Sandur, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone Quarrying Project QL-505 — environmental approval granted, 100 m away
- Expansion of Building Stone Quarry(QL No. 499), "Sri. B.G. Siddanagouda" — initial checks, 4.8 km away
- 33 KV Interconnecting Transmission line for 600 MW Wind Power Project — lapsed, 6.3 km away
- 33kv Interconnecting Underground Transmission line for 600MW Wind Power Project — more information requested, 6.3 km away
- 33kv Interconnecting Underground Transmission line for 600MW wind power project — forest land use approved, 6.3 km away
- Multi Village Water Supply Scheme to Nidugurthi and Other 60 Habitations — in-principle approval, conditions pending, 9.2 km away
- Prospecting for Iron Ore and Manganese Ore in M/s Gadigi Mineral Mining Co.(ML… — lapsed, 9.9 km away
- Prospecting for Iron and Manganese Ore in Block-05 over an extent of 43.48 ha… — forest land use approved, 10.9 km away
More from BASAVANA GOWDA g in Ballari
- Building Stone Quarrying Project QL-505 — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.