Quick answers
What is Building project by Indo-Mim Limited?
This lapsed building project by Indo-Mim Limited is in Kudumalakunta, Gauribidanur, Chikkaballapura, Karnataka. The site covers 16 acres.
Who is building it?
The applicant is Indo-mim Limited.
Has it been approved?
No. The application was lapsed on 9 Aug 2026, so it is no longer under consideration.
Where is it?
In Kudumalakunta, Gauribidanur, Chikkaballapura, Karnataka.
How big is it?
It has a stated cost of ₹400 crore and a site of 16 acres.
When was it filed?
The application was filed on 29 Jun 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 9 Aug 2026 |
| Application filed | 29 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Indo-mim Limited |
| Land area | 16 acres (6.5 ha) |
| Project cost | ₹400 crore |
| Village / locality | Kudumalakunta |
| Taluk / tehsil | Gauribidanur |
| District | Chikkaballapura |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-04604 |
What the filings say
What is planned
Indo-mim Limited, a manufacturer of precision-engineered metal components, proposes an expansion of its manufacturing facility in the Karnataka Industrial Areas Development Board (KIADB) Industrial Area. The project involves increasing the capacity of its existing Carbonyl Iron Powder (CIP) process and establishing a new Gas Atomization process for various metal alloys.
The applicant's project report details the following production capacities:
- Carbonyl Iron Powder Process: Expansion from 180 metric tonnes (MT) per month to 1,000 MT per month.
- Gas Atomization Process: New capacity of 2,000 MT per month for alloys including nickel base, cobalt base, low alloy steel, tool steel, titanium, ferrous base, and copper base.
The facility will operate three shifts per day, six days a week. The total workforce is expected to increase from 150 to 1,100 employees following the expansion.
Manufacturing Process
The gas atomization process uses the Electrode Induction Melting Gas Atomization (EIGA) technique. Raw materials in the form of pre-alloyed bright bars (electrodes) are melted using induction coils in a vacuum or inert atmosphere. High-pressure inert gas, such as argon or nitrogen, is directed at the molten metal to create fine droplets that solidify into spherical metal powders. These powders are then collected, sieved, and blended for use in automotive, medical, aerospace, and defense industries.
Layout and design
The project is situated on a site area of 6.47 hectares (16 acres). The site layout includes several distinct blocks and functional areas:
- Shop Floors: Four separate shop floors (Shop Floor 01 to 04) with building heights ranging from 16.68 metres to 20.50 metres.
- Administrative and Support Blocks: An admin and canteen block, a lab block, and a security block.
- Utility and Process Areas: Dedicated spaces for a Carbon Monoxide (CO) plant, thermal oxidiser, cooling tower, air compressor, gas yard, and a scrap yard.
- Storage: A chemical yard, natural gas yard, and general storage areas.
The total plinth area is 16,500.15 square metres, with a total built-up area of 18,674.30 square metres. The ground coverage is calculated at 25.48%.
Water, power and access
Water Management
The total water requirement for the expanded facility is 120 kilolitres per day (KLD), sourced from borewells and tankers. This includes 50 KLD for domestic purposes, 30 KLD for cooling water, and 40 KLD for manufacturing processes.
Wastewater generation is estimated at 87 KLD. The applicant proposes to treat 40 KLD of domestic sewage in a 50 KLD Sewage Treatment Plant (STP). Industrial wastewater, including 10 KLD from cooling and 37 KLD from manufacturing, will be treated in a 50 KLD Effluent Treatment Plant (ETP). Treated water will be reused for green belt maintenance.
Power and Air Pollution Sources
To support the expansion, the applicant proposes to install four additional 2,250 KVA Diesel Generator (DG) sets, bringing the total to six. Other proposed air pollution sources include:
- Five gas atomizers with air classifiers and screening.
- Fifteen atomizer furnaces (five at 120 kg/hr and ten at 143 kg/hr).
- Five annealing furnaces with 1 tonne/day capacity.
- A flare system and two CO generation units.
Environmental safeguards
The project includes a landscape area of approximately 11,000 square metres. Hazardous waste management plans include the disposal of 5.00 kilolitres per annum (KL/annum) of used spent oil, 5.00 MT/annum of waste residues containing oil, and 8.00 MT/annum of chemical sludge from the wastewater treatment plants. The site plan also incorporates a rainwater harvesting tank and a recharge pit.
Indo-Mim Building Project site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kudumalakunta, Gauribidanur, Chikkaballapura, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- MANUFACTURING OF ACTIVE PHARMACEUTICAL INGREDIENTS BY M/s. R.L. FINE CHEM… — cleared for impact study, 550 m away
- Environmental Clearance Amendment for the Active Pharmaceutical Ingredients… — under environmental review, 650 m away
- Change in Product Mix Without Increasing the Pollution Load for "Active… — initial checks, 650 m away
- Hazardous Waste Incinerator Facility by M/s O2 Eco Park private Limited — environmental approval granted, 1 km away
- Hazardous Waste Incinerator Facility by M/s O2 Eco Park private Limited — returned to applicant, 1 km away
- Hazardous Waste Incinerator Facility by M/s O2 Eco Park private Limited — cleared for impact study, 1 km away
- M/s O2 Eco Park Private Limited — lapsed, 1 km away
- M/s Eco Park Private Limited — lapsed, 1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.