What is Developing? Open the mapMap

LapsedBuildings & townships · Chikkaballapura, Karnataka

Building project by Indo-Mim Limited

This lapsed building project by Indo-Mim Limited is in Kudumalakunta, Gauribidanur, Chikkaballapura, Karnataka. The site covers 16 acres. Its stated project cost is ₹400 crore. As of 27 Nov 2026, its status is “Lapsed” (since 9 Aug 2026).

See it on the live map All projects in Chikkaballapura

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Building project by Indo-Mim Limited?

This lapsed building project by Indo-Mim Limited is in Kudumalakunta, Gauribidanur, Chikkaballapura, Karnataka. The site covers 16 acres.

Who is building it?

The applicant is Indo-mim Limited.

Has it been approved?

No. The application was lapsed on 9 Aug 2026, so it is no longer under consideration.

Where is it?

In Kudumalakunta, Gauribidanur, Chikkaballapura, Karnataka.

How big is it?

It has a stated cost of ₹400 crore and a site of 16 acres.

When was it filed?

The application was filed on 29 Jun 2026.

Project details

StatusLapsed
Status since9 Aug 2026
Application filed29 Jun 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantIndo-mim Limited
Land area16 acres (6.5 ha)
Project cost₹400 crore
Village / localityKudumalakunta
Taluk / tehsilGauribidanur
DistrictChikkaballapura
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-04604

What the filings say

What is planned

Indo-mim Limited, a manufacturer of precision-engineered metal components, proposes an expansion of its manufacturing facility in the Karnataka Industrial Areas Development Board (KIADB) Industrial Area. The project involves increasing the capacity of its existing Carbonyl Iron Powder (CIP) process and establishing a new Gas Atomization process for various metal alloys.

The applicant's project report details the following production capacities:

The facility will operate three shifts per day, six days a week. The total workforce is expected to increase from 150 to 1,100 employees following the expansion.

Manufacturing Process

The gas atomization process uses the Electrode Induction Melting Gas Atomization (EIGA) technique. Raw materials in the form of pre-alloyed bright bars (electrodes) are melted using induction coils in a vacuum or inert atmosphere. High-pressure inert gas, such as argon or nitrogen, is directed at the molten metal to create fine droplets that solidify into spherical metal powders. These powders are then collected, sieved, and blended for use in automotive, medical, aerospace, and defense industries.

Layout and design

The project is situated on a site area of 6.47 hectares (16 acres). The site layout includes several distinct blocks and functional areas:

The total plinth area is 16,500.15 square metres, with a total built-up area of 18,674.30 square metres. The ground coverage is calculated at 25.48%.

Water, power and access

Water Management

The total water requirement for the expanded facility is 120 kilolitres per day (KLD), sourced from borewells and tankers. This includes 50 KLD for domestic purposes, 30 KLD for cooling water, and 40 KLD for manufacturing processes.

Wastewater generation is estimated at 87 KLD. The applicant proposes to treat 40 KLD of domestic sewage in a 50 KLD Sewage Treatment Plant (STP). Industrial wastewater, including 10 KLD from cooling and 37 KLD from manufacturing, will be treated in a 50 KLD Effluent Treatment Plant (ETP). Treated water will be reused for green belt maintenance.

Power and Air Pollution Sources

To support the expansion, the applicant proposes to install four additional 2,250 KVA Diesel Generator (DG) sets, bringing the total to six. Other proposed air pollution sources include:

Environmental safeguards

The project includes a landscape area of approximately 11,000 square metres. Hazardous waste management plans include the disposal of 5.00 kilolitres per annum (KL/annum) of used spent oil, 5.00 MT/annum of waste residues containing oil, and 8.00 MT/annum of chemical sludge from the wastewater treatment plants. The site plan also incorporates a rainwater harvesting tank and a recharge pit.

Indo-Mim Building Project site plan and layout

A drawing from the project's filings. Sign in free to see it.

Indo-Mim Building Project: Site plan: shop floors, utility blocks, gas yard, and internal driveways (preview)🔒 Sign in free to see it
Site plan: shop floors, utility blocks, gas yard, and internal driveways

In context

11 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kudumalakunta, Gauribidanur, Chikkaballapura, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.