Quick answers
What is this project?
Proposed Expansion of Existing Resort project located at Sy. No. 76/2, 76/4, 77, 78/1, 78/2, 78/3, 79, 81/4, 117/1, 117/2 & 121 Mekeri Village, Sampaje Grama, Madikeri Taluk, Kodagu District – 571 201 by M/s. PAUL RESORTS AND HOTELS PRIVATE LIMITED is a lapsed building project in Mekeri, Madikeri, Kodagu, Karnataka. The site covers 27.2 acres.
Who is building it?
The applicant is Paul Resorts and Hotels Private Limited.
Has it been approved?
No. The application was lapsed on 11 Nov 2026, so it is no longer under consideration.
Where is it?
In Mekeri, Madikeri, Kodagu, Karnataka.
How big is it?
It has a stated cost of ₹100 crore and a site of 27.2 acres.
When was it filed?
The application was filed on 12 Aug 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 11 Nov 2026 |
| Application filed | 12 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Paul Resorts and Hotels Private Limited |
| Land area | 27.2 acres (11 ha) |
| Project cost | ₹100 crore |
| Village / locality | Mekeri |
| Taluk / tehsil | Madikeri |
| District | Kodagu |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-04924 |
In context
27 applications in Kodagu since January 2022 are in the same category (Buildings & townships): 2 approved, 17 filed or under review, and 8 withdrawn, lapsed or rejected. At 27.2 acres, this one is larger than 71% of them.
Where it is
Mekeri, Madikeri, Kodagu, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The Leela Coorg Forest Sanctuary — more information requested, 5.4 km away
- Proposed Expansion of existing Resort - "Pai Vista Hotels Pvt Ltd" — environmental approval granted, 5.4 km away
- Proposed Expansion of existing Resort - "Pai Vista Hotels Pvt Ltd" — environmental approval granted, 5.4 km away
- Developing Integrated Solid Waste Management Processing and Disposal Facility — under forest review, 6.2 km away
- Developing Integrated Solid Waste Management Processing and Disposal Facility — lapsed, 6.2 km away
- Establishing 2x12.5 MVA, 66/11KV Sub-Station at Sampaje and Construction of… — under forest review, 7.4 km away
- Building Stone Quarry "Sri. Rafeek M E" — environmental approval granted, 7.8 km away
- Murnad Power Substation, Renewal of Lease for the Existing 33KV Station at… — in-principle approval, conditions pending, 10.8 km away
About this information