Quick answers
What is this project?
Building Stone Quarry "M/s. Inframech Power Solutions Private Limited" is a proposed mining project in Dodda Igalur, Malur, Kolar, Karnataka. The site covers 4 acres.
Who is building it?
The applicant is Uday Pratap Singh Thakur.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Dodda Igalur, Malur, Kolar, Karnataka.
How big is it?
It has a stated cost of ₹70 lakh and a site of 4 acres.
When was it filed?
The application was filed on 30 Oct 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 9 Nov 2026 |
| Application filed | 30 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Uday Pratap Singh Thakur |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹70 lakh |
| Village / locality | Dodda Igalur |
| Taluk / tehsil | Malur |
| District | Kolar |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-05355 |
In context
149 applications in Kolar since January 2022 are in the same category (Mining): 109 approved, 20 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4 acres, this one is larger than 52% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 11 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Dodda Igalur, Malur, Kolar, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone Quarry — environmental approval granted, 200 m away
- BUILDING STONE QUARRY of M/s SKYLARK INFRA ENGINEERING PVT LTD — under environmental review, 200 m away
- Building Stone Quarry — environmental approval granted, 250 m away
- Building Stone Quarry — lapsed, 250 m away
- Integrated Solid Waste Management, Processing and Disposal Facility-Town… — under environmental review, 450 m away
- Integrated Solid Waste Management, Processing and Disposal Facility-Town… — cleared for impact study, 450 m away
- Giga Plant for Manufacturing of Lithium Ion Cylindrical Cells (LFP) of… — environmental approval granted, 4.5 km away
- Diversion of 0.2241 ha (0.2240899 ha) of forest land in Sy No.1 of Hale… — lapsed, 7.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.