Quick answers
What is this project?
Upgradation of 5 Mgd Capacity Water Supply System From Hemavathy River at Gorur to Growth Centre Industrial Area - Hassan District is a lapsed water and irrigation project in Peramanahalli, Hassan, Karnataka. The site covers 37.6 acres.
Who is building it?
The applicant is Thungani Sunilkumar.
Has it been approved?
No. The application was lapsed on 24 Feb 2026, so it is no longer under consideration.
Where is it?
In Peramanahalli, Hassan, Karnataka.
How big is it?
It has a stated cost of ₹43.7 crore; a site of 37.6 acres and 4.5 acres (1.8 ha) of forest land.
When was it filed?
The application was filed on 8 Aug 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 24 Feb 2026 |
| Application filed | 8 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Thungani Sunilkumar |
| Land area | 37.6 acres (15.2 ha) |
| Forest land | 4.5 acres (1.8 ha) |
| Project cost | ₹43.7 crore |
| Village / locality | Peramanahalli |
| Taluk / tehsil | Hassan |
| District | Hassan |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-05925 |
In context
23 applications in Hassan since January 2022 are in the same category (Water & irrigation): 1 approved, 9 filed or under review, and 13 withdrawn, lapsed or rejected. At 37.6 acres, this one is larger than 83% of them.
30 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Peramanahalli, Hassan, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building Stone Quarry" — environmental approval granted, 300 m away
- "Building Stone Quarry" — withdrawn, 300 m away
- Building Stone Quarry(QL No. HMG 569) "Sri. Krishnegowda" — environmental approval granted, 3.1 km away
- Preliminary Exploration for Zinc and Associated Mineralization in Kattaya… — lapsed, 3.4 km away
- Diversion of Forest land for construction of road — initial checks, 4 km away
- Building Stone Quarry "Sri. Bhanuprakash S R" — environmental approval granted, 4.1 km away
- Building Stone Quarry "Sri. Yogisha R" — environmental approval granted, 4.2 km away
- "Building Stone Quarry" by Sri. Hemanth Kumar J.N. — environmental approval granted, 4.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.