What is Developing? Open the mapMap

Initial checksPower · Uttara Kannada, Karnataka

Diversion of 1.5989Ha of forest land

Diversion of 1.5989Ha of forest land is a proposed power project in Karwar M Muncipality, Karwar, Uttara Kannada, Karnataka. The site covers 5.9 acres. Its stated project cost is ₹31 crore. As of 27 Nov 2026, its status is “Initial checks” (since 19 Nov 2026).

See it on the live map All projects in Uttara Kannada

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Diversion of 1.5989Ha of forest land?

Diversion of 1.5989Ha of forest land is a proposed power project in Karwar M Muncipality, Karwar, Uttara Kannada, Karnataka. The site covers 5.9 acres.

Who is building it?

The applicant is Karnataka Power Transmission Corporation Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Karwar M Muncipality, Karwar, Uttara Kannada, Karnataka.

How big is it?

It has a stated cost of ₹31 crore; a site of 5.9 acres and 4 acres (1.6 ha) of forest land.

When was it filed?

The application was filed on 17 Nov 2026.

Project details

Official titleDiversion of 1.5989Ha of forest land at Bada Village, Bada Hobli, in Karwar Taluk, Uttar Kannada District (Karwar Forest Division) for Construction of proposed 110KV LILO Line from existing 110KV Karwar - Binaga S/C Line to proposed 110KV S/S at Kone in Karwar Taluk, Uttar Kannada District for distance of 0.738KM (0.7km in forest & 0.038Km. in non-forest land).
StatusInitial checks
Status since19 Nov 2026
Application filed17 Nov 2026
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantKarnataka Power Transmission Corporation Limited
Land area5.9 acres (2.4 ha)
Forest land4 acres (1.6 ha)
Project cost₹31 crore
Village / localityKarwar M Muncipality
Taluk / tehsilKarwar
DistrictUttara Kannada
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-06019

In context

16 applications in Uttara Kannada since January 2022 are in the same category (Power): 0 approved, 10 filed or under review, and 4 withdrawn, lapsed or rejected. At 5.9 acres, this one is smaller than 94% of them.

18 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Karwar M Muncipality, Karwar, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Karnataka Power Transmission Corporation Limited in Uttara Kannada

7 Karnataka Power Transmission Corporation projects in Uttara Kannada
All 32 Karnataka Power Transmission Corporation projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.