Quick answers
What is Diversion of 0.9929 ha of forest land/ plantation?
Diversion of 0.9929 ha of forest land/ plantation is a lapsed road project in Bagursonnahalli, Malur, Kolar, Karnataka. The site covers 384.7 acres.
Who is building it?
The applicant is Divyasree Indus Golf & Lifestyle Projects.
Has it been approved?
No. The application was lapsed on 26 Feb 2026, so it is no longer under consideration.
Where is it?
In Bagursonnahalli, Malur, Kolar, Karnataka.
How big is it?
It has a stated cost of ₹2.5 crore; a site of 384.7 acres and 2.5 acres (1 ha) of forest land.
When was it filed?
The application was filed on 11 Apr 2024.
Project details
| Official title | Diversion of 0.9929 ha of forest land/ plantation at Sy No.1 of Kadamuthasandra Village, Lakkuru Hobli, Malur Taluk, Kolar District for connecting approach road passing through Kadamutsandra Plantation, Kolar Forest Division [between, existing Panchayat Road & Layout site Boundary] in favour of the M/s DivyaSree Indus Golf and Lifestyle Projects, DivyaSree Chambers, Bangalore |
|---|---|
| Status | Lapsed |
| Status since | 26 Feb 2026 |
| Application filed | 11 Apr 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Divyasree Indus Golf & Lifestyle Projects |
| Land area | 384.7 acres (155.7 ha) |
| Forest land | 2.5 acres (1 ha) |
| Project cost | ₹2.5 crore |
| Village / locality | Bagursonnahalli |
| Taluk / tehsil | Malur |
| District | Kolar |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06071 |
In context
6 applications in Kolar since January 2022 are in the same category (Roads & highways): 0 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected.
Where it is
Bagursonnahalli, Malur, Kolar, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Giga Plant for Manufacturing of Lithium Ion Cylindrical Cells (LFP) of… — environmental approval granted, 6.7 km away
- Diversion of 0.2241 ha (0.2240899 ha) of forest land in Sy No.1 of Hale… — lapsed, 7.3 km away
- Industrial project by Apollo Tricoat Tubes Limited — cleared for impact study, 7.7 km away
- Road project by Associate Decor Limited — lapsed, 7.7 km away
- Industrial project by Apl Apollo Tubes Limited — environmental approval granted, 7.7 km away
- Industrial project by Apl Apollo Tubes Limited — more information requested, 7.7 km away
- Industrial project by Hepa Pharma Private Limited — lapsed, 9.5 km away
- Industrial project by Hepa Pharma Private Limited — cleared for impact study, 9.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.