Quick answers
What is this project?
GOI Funded 4G Saturation Project (Mobile Tower for Rural Uncovered area's) By BSNL @ Ujire Village (Badanaje), , Belthangady Taluka, Dakshina Kannada Dist is a lapsed telecom project in Ujre, Beltangadi, Dakshina Kannada, Karnataka. The site covers 0.1 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 13 Aug 2026, so it is no longer under consideration.
Where is it?
In Ujre, Beltangadi, Dakshina Kannada, Karnataka.
How big is it?
It has a stated cost of ₹50 lakh; a site of 0.1 acres and 290 m² of forest land.
When was it filed?
The application was filed on 15 Mar 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 13 Aug 2026 |
| Application filed | 15 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 300 m² |
| Forest land | 290 m² |
| Project cost | ₹50 lakh |
| Village / locality | Ujre |
| Taluk / tehsil | Beltangadi |
| District | Dakshina Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06162 |
In context
18 applications in Dakshina Kannada since January 2022 are in the same category (Telecom): 7 approved, 1 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 19 months from filing to approval. At 0.1 acres, this one is larger than 50% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ujre, Beltangadi, Dakshina Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- GOI Funded 4G Saturation Project (Mobile Tower for Rural Uncovered area's) By… — lapsed, 0 m away
- Diversion of Forest land for the proposed 2x8MAV,33/11KV Substation at Sy no… — more information requested, 1.4 km away
- Addition of Medical College, General Hospital, Nursing College, Hostel… — environmental approval granted, 4.2 km away
- Widening to 2 Lane With Paved Shoulders From Km. 40.00 to 75.00 (Existing… — under wildlife review, 4.4 km away
- Widening to 2 Lane With Paved Shoulders From Km. 40.00 to 75.00 (Existing… — more information requested, 4.4 km away
- Ordinary Sand Block "Sri. T.C. Anthony" — environmental approval granted, 5.4 km away
- 110kV SC line on DC Tower from existing 110/33/11kV Guruvayanakere station to… — more information requested, 7.5 km away
- Institutional Development & Hostel Building by M/s. Infinity Learning Foundation — under environmental review, 8.4 km away
More from Mahesh Nair in Dakshina Kannada
- GOI Funded 4G Saturation Project (Mobile Tower for Rural Uncovered area's) By… — lapsed
- GOI Funded 4G Saturation Project (Mobile Tower for Rural Uncovered area's) By… — lapsed
- GOI Funded 4G Saturation Project (Mobile Tower for Rural Uncovered area's) By… — forest land use approved
- GOI Funded 4G Saturation Project (Mobile Tower for Rural Uncovered area's) By… — lapsed
- GOI Funded 4G Saturation Project (Mobile Tower for Rural Uncovered area's) By… — lapsed
- GOI Funded 4G Saturation Project (Mobile Tower for Rural Uncovered area's) By… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.