Quick answers
What is this project?
Diversion of 2.48 Ha Additional Forest Land due to Submergence in Nerankimale Reserve Forest in Sy. No. 132 of Golithuttu Village, Uppinangady Taluk, Dakshina Kannada District, in favour of SAGAR POWER (NEERUKATTE) PRIVATE LIMITED, Neerukatte, Uppinangady, Puttur Taluk, Dakshina Kannada is a lapsed building project in Golitattu, Kadaba, Dakshina Kannada, Karnataka. The site covers 6.1 acres.
Who is building it?
The applicant is Sagar Power N Katte Private Limited.
Has it been approved?
No. The application was lapsed on 12 Aug 2026, so it is no longer under consideration.
Where is it?
In Golitattu, Kadaba, Dakshina Kannada, Karnataka.
How big is it?
It has a stated cost of ₹7 crore; a site of 6.1 acres and 6.1 acres (2.5 ha) of forest land.
When was it filed?
The application was filed on 8 Jul 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 12 Aug 2026 |
| Application filed | 8 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Sagar Power N Katte Private Limited |
| Land area | 6.1 acres (2.5 ha) |
| Forest land | 6.1 acres (2.5 ha) |
| Project cost | ₹7 crore |
| Village / locality | Golitattu |
| Taluk / tehsil | Kadaba |
| District | Dakshina Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06180 |
In context
236 applications in Dakshina Kannada since January 2022 are in the same category (Buildings & townships): 110 approved, 39 filed or under review, and 85 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6.1 acres, this one is larger than 83% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Golitattu, Kadaba, Dakshina Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bandaru Sand Block "Sri. Ibrahim" — initial checks, 750 m away
- "Sri. Ibrahim" — environmental approval granted, 3.5 km away
- Ordinary Sand Block — environmental approval granted, 4.5 km away
- "Sri. K.A. Joy" — environmental approval granted, 4.8 km away
- Beltangady Lift Irrigation Scheme to provide Drinking Water Facility and… — more information requested, 6.6 km away
- GOI Funded 4G Saturation Project (Mobile Tower for Rural Uncovered area's) By… — lapsed, 9.2 km away
- Providing Drinking Water Supply Scheme to Alankaru and other 299 Habitations… — more information requested, 9.4 km away
- Widening to 2 lane with paved shoulders to NH-73 (New) Spur Road (Design… — under wildlife review, 9.8 km away
About this information