Quick answers
What is this project?
Providing Lift Irrigation Scheme From Malathi River to Heggodu Village is a lapsed water and irrigation project in Kodlu, Tirthahalli, Shivamogga, Karnataka. The site covers 1 acre.
Who is building it?
The applicant is T Nagaraj.
Has it been approved?
No. The application was lapsed on 7 Feb 2025, so it is no longer under consideration.
Where is it?
In Kodlu, Tirthahalli, Shivamogga, Karnataka.
How big is it?
It has a stated cost of ₹1.4 crore; a site of 1 acre and 1.1 acres (0.4 ha) of forest land.
When was it filed?
The application was filed on 6 Dec 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Providing Lift Irrigation Scheme From Malathi River to Heggodu Village
Project details
| Official title | Providing Lift Irrigation Scheme From Malathi River to Heggodu Village in Thirthahalli Taluk, Shimoga Dist |
|---|---|
| Status | Lapsed |
| Status since | 7 Feb 2025 |
| Application filed | 6 Dec 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | T Nagaraj |
| Land area | 1 acres (0.4 ha) |
| Forest land | 1.1 acres (0.4 ha) |
| Project cost | ₹1.4 crore |
| Village / locality | Kodlu |
| Taluk / tehsil | Tirthahalli |
| District | Shivamogga |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06217 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 Sept 2026 | Initial checks | 1 acre | ₹1.4 crore |
| New project filed 6 Dec 2023 (this page) | Lapsed | 1 acre | ₹1.4 crore |
In context
16 applications in Shivamogga since January 2022 are in the same category (Water & irrigation): 2 approved, 8 filed or under review, and 6 withdrawn, lapsed or rejected. At 1 acre, this one is smaller than 87% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kodlu, Tirthahalli, Shivamogga, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Providing Lift Irrigation Scheme From Malathi River to Heggodu Village — initial checks, 0 m away
- BSNL 4G USO SATURATION PROJECT Bogarkoppa Village (Herabailu), Thirthahalli Tq… — forest land use approved, 1.8 km away
- BSNL 4G USO SATURATION PROJECT Bogarkoppa Village (Chakkodbylu) Thirthahalli — forest land use approved, 3.3 km away
- BSNL 4G USO SATURATION PROJECT Chakkodbylu Thirthahalli — lapsed, 3.3 km away
- Bsnl 4g Uso Saturation Project — lapsed, 3.5 km away
- Bsnl 4g Uso Saturation Project — lapsed, 3.5 km away
- Bsnl 4g Uso Saturation Project — lapsed, 3.5 km away
- Bsnl 4g Uso Saturation Project — lapsed, 3.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.