Quick answers
What is this project?
Srinivasapura Bypass from existing Km 453.890 (Design Ch. 0+000) to existing Km 461.450 (Design Ch 10+080) on NH-69 in the State of Karnataka Under NH (O) on EPC mode. (Job No. NH-69-KNT-2022-23-966) is a proposed road project in Arikeri, Srinivaspur, Kolar, Karnataka. It seeks 5.6 acres of forest land.
Who is building it?
The applicant is Regional Office, Ministry of Road Transport & Highways (Mort&h), Govt of India, Karnataka.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Arikeri, Srinivaspur, Kolar, Karnataka.
How big is it?
It has a stated cost of ₹204.4 crore and 5.6 acres (2.3 ha) of forest land.
When was it filed?
The application was filed on 3 Nov 2023.
Project details
| Official title | Construction of Srinivasapura Bypass from existing Km 453.890 (Design Ch. 0+000) to existing Km 461.450 (Design Ch 10+080) on NH-69 in the State of Karnataka Under NH (O) on EPC mode. (Job No. NH-69-KNT-2022-23-966) |
|---|---|
| Status | More information requested |
| Status since | 22 Sept 2026 |
| Application filed | 3 Nov 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Regional Office, Ministry of Road Transport & Highways (Mort&h), Govt of India, Karnataka |
| Forest land | 5.6 acres (2.3 ha) |
| Project cost | ₹204.4 crore |
| Village / locality | Arikeri |
| Taluk / tehsil | Srinivaspur |
| District | Kolar |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06300 |
In context
6 applications in Kolar since January 2022 are in the same category (Roads & highways): 0 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected.
Where it is
Arikeri, Srinivaspur, Kolar, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Municipal Solid Waste Processing Plant at Srinivasapura — more information requested, 7.3 km away
- Proposed Municipal Solid Waste Processing Plant at Srinivasapura — cleared for impact study, 7.3 km away
- Waste management project by M/s. Meera Envirotech Private Limited — environmental approval granted, 15.1 km away
- Building project by M/s. Meera Envirotech Private Limited — cleared for impact study, 15.1 km away
- Building Stone Quarry of Smt. Nikitha S Vasan — environmental approval granted, 16.1 km away
- "Building Stone Quarry" of Smt. Nikitha S Vasan — environmental approval granted, 16.1 km away
- Building Stone Quarry (QL No. 1028) "M/s. J.N. Stone Products" — environmental approval granted, 16.1 km away
- Building Stone Quarry "M/s. R.R. Stones Private Limited" — environmental approval granted, 20.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.