Quick answers
What is this project?
STP in the Premises Of New TMC Building passing through Forest Land Survey No.555/2 at Terdal is a lapsed building project in Terdai, Rabakavi Banahatti, Bagalkote, Karnataka. The site covers 6.2 acres.
Who is building it?
The applicant is Town Municipal Corporation, Terdal.
Has it been approved?
No. The application was lapsed on 5 Feb 2026, so it is no longer under consideration.
Where is it?
In Terdai, Rabakavi Banahatti, Bagalkote, Karnataka.
How big is it?
It has a stated cost of ₹20 lakh; a site of 6.2 acres and 2.5 acres (1 ha) of forest land.
When was it filed?
The application was filed on 24 Nov 2025.
Project details
| Official title | Construction of STP in the Premises Of New TMC Building passing through Forest Land Survey No.555/2 at Terdal |
|---|---|
| Status | Lapsed |
| Status since | 5 Feb 2026 |
| Application filed | 24 Nov 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Town Municipal Corporation, Terdal |
| Land area | 6.2 acres (2.5 ha) |
| Forest land | 2.5 acres (1 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Terdai |
| Taluk / tehsil | Rabakavi Banahatti |
| District | Bagalkote |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06534 |
In context
17 applications in Bagalkote since January 2022 are in the same category (Buildings & townships): 3 approved, 3 filed or under review, and 11 withdrawn, lapsed or rejected. At 6.2 acres, this one is smaller than 59% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Terdai, Rabakavi Banahatti, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction of Stadium at Terdal Town — lapsed, 200 m away
- Shri Kuruhinashetti Neelakanteshwar high school Terdal — lapsed, 700 m away
- Connecting Road to Shri Sidrammappa Danigond Memorial Trust Schools and Colleges — not approved, 1 km away
- Providing Road Connectivity to Malki Land of Banahatti Village — in-principle approval, conditions pending, 1.1 km away
- For construction of Gayathri Temple — lapsed, 1.1 km away
- Diversion of 0.1650 ha of Forest land — more information requested, 1.5 km away
- Diversion of 26.3052 ha (65 Acres) of forest land in Sy No.97 & 119 of Asangi… — lapsed, 7.3 km away
- Diversion of 0.2643 Ha of Forest land in Sy No. 03 and 07 of Banhatti Village,… — lapsed, 7.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.