Quick answers
What is this project?
Mobile Tower Installation Under GOI USO Funded 4G Saturation project at Suralabi location is a lapsed telecom project in Surlabi, Somvarpet, Kodagu, Karnataka. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 8 Apr 2024, so it is no longer under consideration.
Where is it?
In Surlabi, Somvarpet, Kodagu, Karnataka.
How big is it?
It has a stated cost of ₹50 lakh; a site of 0 acres and 190 m² of forest land.
When was it filed?
The application was filed on 7 Aug 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 8 Apr 2024 |
| Application filed | 7 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 190 m² |
| Project cost | ₹50 lakh |
| Village / locality | Surlabi |
| Taluk / tehsil | Somvarpet |
| District | Kodagu |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06659 |
In context
25 applications in Kodagu since January 2022 are in the same category (Telecom): 9 approved, 4 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 22 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
Where it is
Surlabi, Somvarpet, Kodagu, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Reconnaissance Survey for Cr and Ni in Kundahalli-Takeri block — more information requested, 7.5 km away
- Installtion of 4g Mobile Tower — forest land use approved, 8.6 km away
- Mobile Tower Installation Under GOI USO Funded 4G Saturation project in… — lapsed, 9.9 km away
- Mallalli Falls Ropeway Project — lapsed, 10.7 km away
- Mallalli Falls Ropeway Project — lapsed, 10.7 km away
- Mallalli Falls Ropeway Project — lapsed, 10.7 km away
- Mallalli Falls Ropeway Project — application filed, 10.8 km away
- For construction of Sri Shantamallikarjuna Mini Hydel Scheme/Project across… — under forest review, 12.3 km away
More from Mahesh Nair in Kodagu
- Mobile Tower Installation Under GOI USO Funded 4G Saturation project at… — not approved
- Installtion of 4g Mobile Tower — forest land use approved
- Mobile Tower Installation Under GOI USO Funded 4G Saturation project at… — lapsed
- Mobile Tower Installation Under GOI USO Funded 4G Saturation project — forest land use approved
- Mobile Tower Installation Under GOI USO Funded 4G Saturation project in KANIVE… — forest land use approved
- Mobile Tower Installation Under GOI USO Funded 4G Saturation project at… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.