Project details
| Official title | Construction of 66KV Multi Circuit Line From Proposed 220/66 KV Holalkere Substation to Lilo of 66KV Existing Holalkere-Pandrahalli Dc Line (Between 66KV H.D Pura and Pandrahalli Substation) With Coyote Conductor for Three Circuits & Coyote Equivalent Hpc for Connecting 66KV H.D Pura Substation With Suitable Modification in Protection Equipments for a Distance of 22.097kms in Holalkere Taluk & Chitradurga Dist. |
|---|---|
| Status | More information requested |
| Status since | 16 Nov 2026 |
| Application filed | 22 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Major Works Division Kptcl Chitradurga |
| Land area | 31,396.4 acres (12,705.7 ha) |
| Forest land | 11.2 acres (4.5 ha) |
| Project cost | ₹58.5 crore |
| Village / locality | Adanuru |
| Taluk / tehsil | Holalkere |
| District | Chitradurga |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06678 |
In context
19 applications in Chitradurga since January 2022 are in the same category (Power): 0 approved, 12 filed or under review, and 7 withdrawn, lapsed or rejected. At 31,396.4 acres, this one is larger than 95% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Adanuru, Holalkere, Chitradurga, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building Stone Quarry" of Sri. T. Thippeswamy — lapsed, 1.2 km away
- Building Stone Quarry (QL No. CTA-611) "Sri. T. Thippeswamy" — lapsed, 1.2 km away
- Building Stone Quarry — lapsed, 1.3 km away
- Building Stone Quarry (QL No. CTA-610) "Sri. T. Manjunath" — lapsed, 1.3 km away
- Diversion of forest land in Multiple Villages in Holalkere and Hosadurga… — under wildlife review, 5.6 km away
- Diversion of forest land in Multiple Villages in Holalkere and Hosadurga… — forest land use approved, 5.6 km away
- Diversion of 15.67 Ha Land (8.49 Ha Forest Land and 7.18 Ha Revenue Land) for… — lapsed, 6.6 km away
- Prospecting for Iron Ore and Manganese Ore in M/s KASHIMURTHY SHETTY AND SONS… — in-principle approval, conditions pending, 7.4 km away
More from Major Works Division Kptcl Chitradurga in Chitradurga
- New 220KV DC Line on DC towers of 43.092Kms from proposed 220/66KV… — initial checks
- New 220KV DC Line on DC towers of 43.092Kms from proposed 220/66KV… — lapsed
- New 66KV LILO Line on DC towers of 14.132Kms from existing 66kV Chitradurga -… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.