Project details
| Status | More information requested |
|---|---|
| Status since | 16 Aug 2023 |
| Application filed | 9 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer National Highway Division |
| Land area | 3,100 m² |
| Forest land | 39.3 acres (15.9 ha) |
| Project cost | ₹592 crore |
| Village / locality | Sunkadamakki |
| Taluk / tehsil | Sringeri |
| District | Chikkamagaluru |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06681 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 9 Jan 2023 (this page) | More information requested | 0.8 acres | ₹592 crore |
| New project filed 7 Jan 2023 | Application filed | 0.8 acres | ₹592 crore |
In context
5 applications in Chikkamagaluru since January 2022 are in the same category (Roads & highways): 0 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected.
Where it is
Sunkadamakki, Sringeri, Chikkamagaluru, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Widening to Two Lane With Paved Shoulder From Existing Single/Intermediate… — application filed, 0 m away
- Diversion of 0.846 ha forest area for laying of Underground Optical Fibre… — more information requested, 6.9 km away
- Laying of Underground Optical Fibre Cable along the road (NH-169) between… — lapsed, 6.9 km away
- Laying of Underground Optical Fibre Cable along the road (NH-169) between… — lapsed, 6.9 km away
- Laying of Underground Optical Fibre Cable along the road (NH-169) between… — more information requested, 6.9 km away
- Laying and establishment of 11KV distribution line — more information requested, 10.2 km away
- Laying and establishment of 11KV distribution line — more information requested, 10.2 km away
- Laying and establishment of 11KV distribution line — more information requested, 10.3 km away
More from Executive Engineer National Highway Division in Chikkamagaluru
- Widening to Four Lane Rigid Pavement From Existing Intermediate Lane Flexible… — more information requested