Quick answers
What is this project?
Improvements to Existing Water Supply Scheme to Haliyal Town with Kali River as Source and Remodelling of Water Supply Distribution Network System to Dandeli City, Uttara Kannada District, Karnataka, including Operation & Maintenance for a Period of 5 Years (Including 1 Year DLP) through Design, Build, Operation, and Transfer (DBOT) Mode is an approved water and irrigation project in Ajgaon, Haliyal, Uttara Kannada, Karnataka. The site covers 4.5 acres.
Who is building it?
The applicant is Town Muncipal Council Haliyal.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 11 Sept 2026), as of 27 Nov 2026.
Where is it?
In Ajgaon, Haliyal, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹116.7 crore; a site of 4.5 acres and 1.5 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 29 Dec 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 11 Sept 2026 |
| Application filed | 29 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Town Muncipal Council Haliyal |
| Land area | 4.5 acres (1.8 ha) |
| Forest land | 1.5 acres (0.6 ha) |
| Project cost | ₹116.7 crore |
| Village / locality | Ajgaon |
| Taluk / tehsil | Haliyal |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06776 |
In context
63 applications in Uttara Kannada since January 2022 are in the same category (Water & irrigation): 2 approved, 48 filed or under review, and 13 withdrawn, lapsed or rejected. At 4.5 acres, this one is larger than 65% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ajgaon, Haliyal, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rub (Road Under Bridge) in Lieu of Lc (Level Crossing) 11 in Alnavar-Ambewadi… — lapsed, 2.9 km away
- 4g SATURATION PROJECT BSNL — lapsed, 5.1 km away
- Uso 4g Saturation Project at Gardolli — lapsed, 5.3 km away
- Providing 4g/5g Coverage to Uncovered Villages Under Haliyal Dcf of Karwar Ssa — lapsed, 5.6 km away
- Bsnl 4g Saturation Project at Rayapattana — forest land use approved, 6.4 km away
- Shreyas Paper PVT LTD Dandeli — more information requested, 7.5 km away
- The Release of Forest Land for Burial Ground for Christian Community of… — initial checks, 7.7 km away
- Expansion of Distillery Unit From 90 Kld to 210 Kld Under Ebp Program — environmental approval granted, 8.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.