One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of Forest Land for Utilization of an Existing Railway Track in Sy No. 586 of…
Project details
| Official title | Diversion of Forest Land for Utilization of an Existing Railway Track in Sy No. 586 of Gunda Reserved Forest in Danapura Village, Hospet Taluk, Vijayanagara District, Karnataka, in favour of M/s. BMM Ispat Limited. |
|---|---|
| Status | Lapsed |
| Status since | 13 May 2025 |
| Application filed | 26 Nov 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Railways & metro |
| Applicant | Bmm Ispat Limited |
| Land area | 9.6 acres (3.9 ha) |
| Forest land | 3,590 m² |
| Project cost | ₹5 crore |
| Village / locality | Dhanapura |
| Taluk / tehsil | Hosapete |
| District | Vijayanagar |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-07197 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Dec 2025 | Under forest review | 8.6 acres | ₹5 crore |
| New project filed 26 Nov 2024 (this page) | Lapsed | 9.6 acres | ₹5 crore |
In context
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhanapura, Hosapete, Vijayanagar, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for Utilization of an Existing Railway Track in Sy… — under forest review, 150 m away
- Brownfield Expansion of Integrated Steel Plant from 0.96 MTPA to 2.1 MTPA — environmental approval granted, 400 m away
- Brownfield Expansion of Integrated Steel Plant from 0.96 MTPA to 2.1 MTPA — more information requested, 400 m away
- Diversion of 0.442 Ha of forest land for utility corridor in Gunda Reserved… — lapsed, 1.8 km away
- Shifting of 220kV Lingapura-BMM-Ittagi line passing through the Sandur… — lapsed, 1.9 km away
- Shifting of 220kV Lingapura-BMM-Ittagi line passing through the Sandur… — lapsed, 1.9 km away
- Diversion of 4.7088 Ha of forest land for utility corridor in Gunda & Gunda… — lapsed, 1.9 km away
- Approval under section 2(1)(iii) of the Van (Sanrakshan Evam Samvardhan)… — under forest review, 3.8 km away
More from Bmm Ispat Limited in Vijayanagar
- Brownfield Expansion of Integrated Steel Plant from 0.96 MTPA to 2.1 MTPA — environmental approval granted
- Brownfield Expansion of Integrated Steel Plant from 0.96 MTPA to 2.1 MTPA — more information requested
All 4 Bmm Ispat projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.