Quick answers
What is Kumta - Honnavara Joint Water Treatment Plant?
Kumta - Honnavara Joint Water Treatment Plant is a lapsed water and irrigation project in Divalli, Kumta, Uttara Kannada, Karnataka. The site covers 2.5 acres.
Who is building it?
The applicant is Chief Officer Town Muncipal Cooncil.
Has it been approved?
No. The application was lapsed on 31 May 2026, so it is no longer under consideration.
Where is it?
In Divalli, Kumta, Uttara Kannada, Karnataka.
How big is it?
It has a site of 2.5 acres and 2.5 acres (1 ha) of forest land.
When was it filed?
The application was filed on 27 May 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 31 May 2026 |
| Application filed | 27 May 2025 |
| Approval sought | Forest land use |
| Application type | Renewal |
| Sector | Water & irrigation |
| Applicant | Chief Officer Town Muncipal Cooncil |
| Land area | 2.5 acres (1 ha) |
| Forest land | 2.5 acres (1 ha) |
| Village / locality | Divalli |
| Taluk / tehsil | Kumta |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-07565 |
In context
63 applications in Uttara Kannada since January 2022 are in the same category (Water & irrigation): 2 approved, 48 filed or under review, and 13 withdrawn, lapsed or rejected. At 2.5 acres, this one is larger than 54% of them.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Divalli, Kumta, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- USO 4G mobile tower at KAVALODI — forest land use approved, 2.9 km away
- Bsnl Usof 4g Saturation Project at Kavalodhi - Ofc Route Is Proposed for… — lapsed, 3.6 km away
- Bsnl Usof 4g Saturation Project at Kavalodhi - Ofc Route Is Proposed for… — lapsed, 3.6 km away
- USO 4G mobile tower at Abbolli — forest land use approved, 3.9 km away
- USOF 4G Saturation project in Kumta Taluka — lapsed, 4.3 km away
- USOF 4G Saturation project in Kumta Taluka — lapsed, 4.3 km away
- USOF 4G Saturation project in Kumta Taluka — lapsed, 4.3 km away
- USOF 4G Saturation project in Kumta Taluka — lapsed, 4.3 km away
More from Chief Officer Town Muncipal Cooncil in Uttara Kannada
- Proposed area for diversion of forest land For Construction of Solid Waste… — initial checks
- Proposed area for diversion of forest land For Construction of Solid Waste… — not approved
- Diversion of 3.73 Ha of Forest Land in Kumta Taluka for the Purpose of… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.