What is Developing? Open the mapMap

WithdrawnTelecom · Kodagu, Karnataka

Mobile Tower Installation Under GOI USO Funded 4G Saturation project at MAJJIGEHLLA

Mobile Tower Installation Under GOI USO Funded 4G Saturation project at MAJJIGEHLLA is a withdrawn telecom project in Badragola, Ponnampet, Kodagu, Karnataka. The site covers 0.1 acres. Its stated project cost is ₹50 lakh. As of 27 Nov 2026, its status is “Withdrawn” (since 16 Aug 2023).

See it on the live map All projects in Kodagu

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Mobile Tower Installation Under GOI USO Funded 4G Saturation project at MAJJIGEHLLA is a withdrawn telecom project in Badragola, Ponnampet, Kodagu, Karnataka. The site covers 0.1 acres.

Who is building it?

The applicant is Mahesh Nair.

Has it been approved?

No. The application was withdrawn on 16 Aug 2023, so it is no longer under consideration.

Where is it?

In Badragola, Ponnampet, Kodagu, Karnataka.

How big is it?

It has a stated cost of ₹50 lakh and a site of 0.1 acres.

When was it filed?

The application was filed on 16 Aug 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Mobile Tower Installation Under GOI USO Funded 4G Saturation project at MAJJIGEHLLA

Project details

Official titleMobile Tower Installation Under GOI USO Funded 4G Saturation project at MAJJIGEHLLA in ponnampet taluk kodagu district
StatusWithdrawn
Status since16 Aug 2023
Application filed16 Aug 2023
Approval soughtWildlife review
Application typeNew project
SectorTelecom
ApplicantMahesh Nair
Land area300 m²
Project cost₹50 lakh
Village / localityBadragola
Taluk / tehsilPonnampet
DistrictKodagu
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-07842

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 14 May 2025Not approved0.1 acres₹50 lakh
New project filed 16 Aug 2023 (this page)Withdrawn0.1 acres₹50 lakh

In context

25 applications in Kodagu since January 2022 are in the same category (Telecom): 9 approved, 4 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 22 months from filing to approval. At 0.1 acres, this one is larger than 84% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Badragola, Ponnampet, Kodagu, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Mahesh Nair in Kodagu

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.