Quick answers
What is this project?
Request for Permission to conduct Ariel inspection of EHV Transmission lines of KPTCL, Towers, Corridor, Data Collection & others works specified using Unmanned Aviation System ( UAS/ DRONE ) and other works which covers 220kV transmission Lines is a proposed power project in Anmod, Supa, Uttara Kannada, Karnataka. The site covers 86.5 acres.
Who is building it?
The applicant is Prabhakara Y.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Anmod, Supa, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹10 crore and a site of 86.5 acres.
When was it filed?
The application was filed on 19 Dec 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 19 Dec 2025 |
| Application filed | 19 Dec 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Power |
| Applicant | Prabhakara Y |
| Land area | 86.5 acres (35 ha) |
| Project cost | ₹10 crore |
| Village / locality | Anmod |
| Taluk / tehsil | Supa |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08058 |
In context
16 applications in Uttara Kannada since January 2022 are in the same category (Power): 0 approved, 10 filed or under review, and 4 withdrawn, lapsed or rejected. At 86.5 acres, this one is larger than 69% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Anmod, Supa, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Augmentation of Drinking Water Supply Scheme of Ramnagar Village with… — more information requested, 350 m away
- Uso 4g Saturation Project at Varande — lapsed, 4.5 km away
- Mining project by M/s MGR Stone Crushers — environmental approval granted, 5.2 km away
- Building Stone Quarry of Sri. Deepak Mallu Kankonkar — environmental approval granted, 5.2 km away
- Building Stone Quarry — environmental approval granted, 5.2 km away
- Building Stone and Murram Quarry "M/s. Dilip Buildcon Limited" — initial checks, 5.4 km away
- Building Stone & Murram Quarry — lapsed, 5.4 km away
- "Building Stone Quarry" of "Shri Shastabalaji Stone Crusher Private Limited'' — environmental approval granted, 5.5 km away
More from Prabhakara Y in Uttara Kannada
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.