Quick answers
What is this project?
Tinaighat-Castlerock-Caranzol Railway doubling of South Western Railways(in the state of Karnataka) is a proposed railway project in Kalambuli, Supa, Uttara Kannada, Karnataka. The site covers 47.4 acres.
Who is building it?
The applicant is South Western Railway.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Kalambuli, Supa, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹900 crore and a site of 47.4 acres.
When was it filed?
The application was filed on 4 Jun 2025.
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 4 Jun 2025 |
| Application filed | 4 Jun 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Railways & metro |
| Applicant | South Western Railway |
| Land area | 47.4 acres (19.2 ha) |
| Project cost | ₹900 crore |
| Village / locality | Kalambuli |
| Taluk / tehsil | Supa |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08070 |
In context
5 applications in Uttara Kannada since January 2022 are in the same category (Railways & metro): 0 approved, 4 filed or under review, and 0 withdrawn, lapsed or rejected.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kalambuli, Supa, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- For laying of 110 KV Transmission Line passing in Sy No. 47 of Anmod Village… — decision issued, 1.2 km away
- For laying of 110 KV Transmission Line passing in Sy No. Nil of Anmod Village… — more information requested, 1.2 km away
- Railway Electrification from Tinaighat to Vasco Da Gama — decision issued, 2.9 km away
- For Laying of 110 KV Underground Cables (From the Existing Kptcl Substation at… — under wildlife review, 3.2 km away
- For Laying of 110 KV Underground Cables (From the Existing Kptcl Substation at… — initial checks, 3.2 km away
- Conducting Survey for Carrying Out Underground Cabling Works (In Lieu of Eht… — decision issued, 3.2 km away
- For laying of 110 KV Transmission Line [from Anmod existing KPTCL Sub-Station… — lapsed, 3.2 km away
- For Laying of 110 KV Underground Cables (From the Existing Kptcl Substation at… — more information requested, 3.8 km away
All 3 South Western Railway projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.