Quick answers
What is this project?
Proposed for Construction of Bridge and Approach Road in Sy No 8 and Kapila River, Doddabairanakuppe Village, Antarasante Hobli, Heggadevanakote Taluk, Mysore District is a proposed building project in Doddabyranakuppe, Heggadadevankote, Mysuru, Karnataka. The site covers 1.1 acres.
Who is building it?
The applicant is Executive Engineer Public Work Department Hunsur.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Doddabyranakuppe, Heggadadevankote, Mysuru, Karnataka.
How big is it?
It has a stated cost of ₹35 crore and a site of 1.1 acres.
When was it filed?
The application was filed on 14 Dec 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 14 Dec 2025 |
| Application filed | 14 Dec 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Executive Engineer Public Work Department Hunsur |
| Land area | 1.1 acres (0.4 ha) |
| Project cost | ₹35 crore |
| Village / locality | Doddabyranakuppe |
| Taluk / tehsil | Heggadadevankote |
| District | Mysuru |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08119 |
In context
39 applications in Mysuru since January 2022 are in the same category (Buildings & townships): 18 approved, 15 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.1 acres, this one is smaller than 95% of them.
Where it is
Doddabyranakuppe, Heggadadevankote, Mysuru, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Providing Functional Household Tap Connections (93 FHTC's) to 5 House Holds — initial checks, 28.7 km away
- Improvements to Road from Beddalapura to Huskur Hadi MDR Road,in H.D Kote… — more information requested, 30.8 km away
- Improvements to Road from Beddalapura to Huskur Hadi MDR Road,in H.D Kote… — more information requested, 30.9 km away
- Improvements to the Road from Beddalapura to Huskur Hadi MDR Road — more information requested, 31.4 km away
- Improvements to Road from Beddalapura to Huskur Hadi MDR Road,in H.D Kote… — initial checks, 31.4 km away
- 5.0MLD WTP at Yarahalli Hand Post Under IWSS to H D Kote Town under AMRUT 2.0 — initial checks, 31.5 km away
- Constriction of 5.0 MLD WTP at H D Kote Town Under AMRUT 2.0 — lapsed, 31.5 km away
- Muilti Village Drinking Water Supply Scheme to Manuganahalli & Other 58… — initial checks, 33.9 km away
More from Executive Engineer Public Work Department Hunsur in Mysuru
- New road from Ravandur Bettadapura Road Ch. 34.30 (Foot of the Hill) to Sri… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.