Quick answers
What is GOLDEN RAYS- Home Stay?
GOLDEN RAYS- Home Stay is a lapsed project in Tann|Rbhavi, Mangaluru, Dakshina Kannada, Karnataka. The site covers 0 acres.
Who is building it?
The applicant is Dezy Dsouza.
Has it been approved?
No. The application was lapsed on 16 Sept 2026, so it is no longer under consideration.
Where is it?
In Tann|Rbhavi, Mangaluru, Dakshina Kannada, Karnataka.
How big is it?
It has a stated cost of ₹15 lakh and a site of 0 acres.
When was it filed?
The application was filed on 9 Mar 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 16 Sept 2026 |
| Application filed | 9 Mar 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Other |
| Applicant | Dezy Dsouza |
| Land area | 100 m² |
| Project cost | ₹15 lakh |
| Village / locality | Tann|Rbhavi |
| Taluk / tehsil | Mangaluru |
| District | Dakshina Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08189 |
In context
52 applications in Dakshina Kannada since January 2022 are in the same category (Other): 15 approved, 7 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
98 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tann|Rbhavi, Mangaluru, Dakshina Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Road Bridge across Gurupura river between Sultan Battery and Tannirbhavi — coastal clearance granted, 50 m away
- Above-grade Pedestrian Pathway/Walk Way (Cable Suspension Bridge) between… — lapsed, 50 m away
- Creation of Berthing and Landside Facilities at Thannir Bhavi Church, Karnataka — coastal clearance granted, 150 m away
- Creation of Berthing and Landside Facilities at Thannirbhavi Church, Karnataka — lapsed, 200 m away
- Minor Shipyard for Construction, Repair and Maintenance of Marine Vessels at… — more information requested, 350 m away
- Road Bridge across Gurupura river between Sultan Battery and Tannirbhavi — forest land use approved, 350 m away
- Open Air Theatre and Water Sports Park at Nayar Kudru — lapsed, 350 m away
- Creation of Berthing and Landside Facilities at Sulthan Battery, Karnataka — lapsed, 500 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.